Tamil Nadu Electricity Distribution (Amendment) Code, 2009

Tamil Nadu Electricity Distribution (Amendment) Code 2009

AmendmentDated 24 Aug 2009TNERC/DC/8 – 12 dated 24-08-2009

Amends the Tamil Nadu Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page TNERC notification amending the Tamil Nadu Electricity Distribution Code. Clause 1 gives the instrument its short title and makes it commence on the date of its publication in the Tamil Nadu Government Gazette (p1). Clause 2 substitutes clause (ii) of sub-regulation (12) of regulation 29 of the Principal Code, which governs the space to be allotted for a sub-station or switching station in group housing and commercial complexes where the total demand exceeds 5 MVA (p1–2).

The substituted clause caps the land to be provided for sub-stations by voltage level, separately for normal and compact designs, and requires the area to be shown in the plan, to have an approach road on at least one side and to have dimensions as suggested by the licensee to the consumer (p2). A note sets out the distances from metropolitan/corporation, municipality and town panchayat limits within which the licensee may build a compact sub-station, and leaves the choice of design to the licensee elsewhere (p2). It binds the distribution licensee and applies to such developers and consumers in Tamil Nadu; the gazette date on which it takes effect is not printed.

Standard name
Distribution Code
Primary topics
Supply to buildings and colonies, Distribution system planning and operation

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document