Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution (Second Amendment) Code, 2011 — Draft

Tamil Nadu Electricity Distribution (Second Amendment) Code 2011

Draft amendmentDated 1 Dec 2011TNERC/DC/8 dated 01-12-2011

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Tamil Nadu Electricity Regulatory Commission issued this draft notification (No. TNERC/DC/8, dated 01-12-2011) to amend the Tamil Nadu Electricity Distribution Code, 2004, and invited comments or suggestions up to 21-12-2011 (p1). It is a consultation draft: the preamble records that the amendments are subject to previous publication, and clause 1 brings them into force only on publication in the Tamil Nadu Government Gazette, a date the draft does not print (p1).

Clause 1 names the instrument the Tamil Nadu Electricity Distribution (Second Amendment) Code 2011 (p1). Clause 2 substitutes Regulation 26 in full, replacing the existing provision on categories of supply with a voltage ladder — single-phase 240 V, three-phase 415 V, then 11 kV or 22 kV, 33 kV, 110 kV and 230 kV — each step tied to a band of connected load or contract demand, with the middle bands keyed to whether the area is fed at 11 kV or 22 kV (p1–2). It lets small consumers choose between the two low-tension categories, requires LTCT metering above a stated LT demand, and makes a consumer who voluntarily opts for a higher voltage than needed bear the licensee's extra cost (p2).

Clause 3 inserts Regulation 32(1A), requiring an ABT-compliant meter at both the generator end and the consumer end for open access consumers (p2).

Standard name
Distribution Code
Primary topics
Conditions of supply, Metering

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document