Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Draft Amendment to the Tamil Nadu Electricity Distribution Code — Agricultural Service Connections

Draft of amendment to the Tamil Nadu Electricity Distribution Code

Draft amendmentDated 6 Mar 2020TNERC/DC/8– dated .03.2020

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

TNERC has published a draft amendment to the Tamil Nadu Electricity Distribution Code for objections and suggestions, with comments invited by 06.04.2020 and the draft to be taken up after thirty days from publication on the TNERC website (p1). The notification is issued under section 181 read with section 46 of the Electricity Act 2003 and names the persons likely to be affected (p1).

The core changes rewrite the handling of agricultural service connections. Regulation 27 gains a designated-engineer application route and a requirement to display designated engineers in section offices and on the website (p1). Its agricultural supply procedure is replaced to use Form 2, follow Government of Tamil Nadu directions under section 108(1), assign divisional seniority, release connections more evenly across divisions and circles, treat the terminal LT pole as the distribution main, regulate allied uses through a sealed changeover switch, issue readiness notices, effect supply first-come-first-served, keep applications live for a limited period, and allow name transfer or shifting before supply with seniority consequences (p2–4).

Regulation 29(2) is replaced with eligibility rules for multiple connections within a survey field and for shared wells, including a 0.5 acre minimum irrigated-area threshold (p4). Regulation 30(5) requires LT motor/pump sets to meet BIS/BEE-certified standards (p4). Regulation 31 gains a rule that an agricultural application lapses if supply is not availed within two years of the supply availability notice (p5).

Annexure III gets a new Form 2 application for agricultural pump-set supply, covering applicant details, land and well particulars, ownership proofs, co-owner consent, existing connections, dues and licensee acknowledgement (p5–7). The explanatory statement ties the amendments to the State Government's annual energisation targets and schemes such as self-financing and Tatkal, and says they provide a detailed procedure for agricultural services and shifting (p8). A side-by-side statement of existing and proposed provisions follows (pp9–18).

Standard name
Distribution Code
Primary topics
Agricultural supply, New connections and load changes, Conditions of supply

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document