Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution Code, 2004 — 2006 Amendment

Tamil Nadu Electricity Distribution (Amending) Code 2006

AmendmentDated 31 May 2006TNERC/DC/8-3 dated 31/05/2006

Amends the Tamil Nadu Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short TNERC amendment to the Tamil Nadu Electricity Distribution Code, dealing with how electricity supply is given to premises standing on poromboke land. It is notified as TNERC/DC/8-3 dated 31/05/2006 and amends the Distribution Code issued under Notification No. TNERC/DC/8/1 dated 21.07.2004 and published on 1 September 2004 (p1). It comes into force on the date of publication in the Tamil Nadu Government Gazette (p1); the Gazette date itself is not printed in the text.

Clause 1 gives the short title and commencement (p1). Clause 2(1) substitutes Regulation 27(12) so that supply on poromboke land is given on production of a No Objection Certificate from an officer not below the rank of Deputy Tahsildar, or — where the applicant cannot produce such a certificate — on furnishing a prescribed undertaking (p1).

The undertaking, reproduced on p1–2, is a two-part declaration in which the applicant acknowledges liability to eviction and to disconnection of supply if the land is required by the Government or a dispute later arises, and states that the supply confers no claim to ownership of the land and no permanent or full right over it.

Clause 2(2) (p2) carries the same requirement into the application form: Annexure III, Form No. 3, item 7 gains a new sub-item (d) declaring that the structure is built on poromboke land, with the same undertaking and a note to delete the clause that does not apply. The amendment is signed by the Secretary, TNERC.

Standard name
Distribution Code
Primary topics
New connections and load changes, Conditions of supply

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document