Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code and Distribution Code — Draft Amendments, 2015

Draft on amendments to the Tamil Nadu Electricity Supply Code & Distribution Code

Draft codeDated 25 Mar 2015TNERC/SC/7 dated -3-2015

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Distribution Code — FORM-4 Amendment, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a pair of draft amendment notifications issued by the Tamil Nadu Electricity Regulatory Commission for public comment, not a final amendment. Both invite objections or suggestions by 24-4-2015 and describe a 30-day consultation period running from publication or hosting on the Commission's website (p1, p4).

The first draft (pp1–3) proposes substituting regulation 16 of the Tamil Nadu Electricity Supply Code. It would expressly permit consumers to deposit electricity charges in advance, require such deposits to be recorded in the consumer meter card, and provide for interest at the bank rate or a Commission-specified rate credited to the consumer's ledger account (pp1–2). A separate facility is created for low-tension domestic consumers who lock their premises and leave for more than two months: they may pay advance charges for up to one year, extendable on request, following a written request one month before leaving, a meter reading 15 days before vacation, a pro-rata bill, payment before seven days of vacation, and formal approval recording the amount and period (p2). The connection is protected from disconnection while the approved advance lasts, but the licensee may disconnect beyond the approved period if the advance is insufficient; no interest is credited on the unadjusted balance under this facility (p2–3). On return, the consumer must intimate within seven days, the licensee reads the meter within seven days, and any shortfall or unadjusted amount is dealt with in the next bill (p3).

The second draft (pp4–5) proposes inserting regulation 39(1A) in the Tamil Nadu Electricity Distribution Code. Where a building is demolished in whole or part and the consumer needs the existing service connection for reconstruction, the connection may continue under the construction tariff on an undertaking. If there are multiple connections, only one is retained on construction tariff and the rest must be surrendered. After construction, the connection is converted to the appropriate tariff category (p4–5).

Standard name
Electricity Supply Code, Distribution Code
Primary topics
Billing and payment, New connections and load changes

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document