TNERC · Tamil Nadu Electricity Regulatory Commission
Tamil Nadu Electricity Distribution Code
CodeDated 21 Jul 2004Published in the Gazette 1 Sep 2004Notification No. TNERC / DC / 8 / 1 dated 21.07.2004
31 amendments to it are on Voltaic, the latest dated 2 Sep 2023.
Summary
Summary written by software, from pages 1 to 19 of 52. Check the regulator's original before you rely on it.
The Tamil Nadu Electricity Distribution Code is a principal TNERC regulation that sets the framework for electricity distribution in Tamil Nadu from the date of its publication in the Tamil Nadu Government Gazette (p1). It is made under sections 46 and 86 of the Electricity Act 2003 and applies to distribution licensees, consumers already connected or seeking connection, the STU, SLDC/SSLDC, and other entities connected to the distribution system (p1, p3–5).
Chapter 1 gives the short title, commencement and definitions of technical, commercial and operational terms (p1–3). Chapter 2 sets out the roles and duties of the SLDC, SSLDC, STU, distribution licensees and TNERC itself, including open access, transmission and planning functions (p3–5). Chapter 3 prescribes the distribution system planning framework: objectives, network expansion stages, load forecasting and load research, data sharing with STU/Commission, planning criteria, substation design, line clearance and earthing requirements (p5–9).
Chapter 4 specifies connectivity conditions for connection to the distribution system, including technical criteria, interface with small generators using wind, biomass or captive plants, protection coordination, operational labelling, metering, communication, voltage/frequency/power-factor management and demand side management (p9–11). Chapter 5 provides operating guidelines: demand estimation, scheduled shutdowns, contingency and outage restoration, load shedding, safety coordination, Line Clear Permits, protection of railways/telecom infrastructure, accident and major incident reporting, preventive maintenance, tools, training and R&D (p11–16). Chapter 6 begins the terms and conditions for supply: system voltages, categories of supply, requisition procedures, service connection restrictions and service line/space obligations; it continues beyond the supplied pages (p16–19).
Read with this
Amendments and corrections
- Dated 22 Nov 2005Tamil Nadu Electricity Distribution (Amendment) Code 2005
- Dated 23 Feb 2006Tamil Nadu Electricity Distribution Code, 2004 — 2006 Amendment
- Dated 31 May 2006Tamil Nadu Electricity Distribution Code, 2004 — 2006 Amendment
- Dated 14 Jun 2006Tamil Nadu Electricity Distribution Code 2006 — Amendment — point of supply beyond 30 m
- Dated 22 Jun 2006Tamil Nadu Electricity Distribution (Amendment) Code 2006
- Dated 20 Jul 2006Tamil Nadu Electricity Distribution Code, 2004 — Amendment Code, 2006
- Dated 10 Sep 2007Tamil Nadu Electricity Distribution (Amendment) Code, 2007
- Dated 3 Dec 2007Tamil Nadu Electricity Supply Code, Distribution Code and Standard of Performance (Amendment) Regulations 2007
- Dated 8 Feb 2008Tamil Nadu Electricity Distribution Code, 2004 — First Amendment, 2008
- Dated 22 May 2008Tamil Nadu Electricity Distribution Code — Second Amendment, 2008
- Dated 29 Jun 2009Tamil Nadu Electricity Distribution (Amendment) Code, 2009
- Dated 24 Aug 2009Tamil Nadu Electricity Distribution (Amendment) Code, 2009
- Dated 14 Mar 2011Amendment of Clause 51 of the Principal Code
- Dated 17 Feb 2012Tamil Nadu Electricity Distribution (Amendment) Code 2012
- Dated 29 Nov 2012Tamil Nadu Electricity Distribution Code — Amendment, 2012
- Dated 6 Sep 2013Tamil Nadu Electricity Distribution Code, Regulation 39 (Temporary Supply) — Amendment, 2013
- Dated 26 Nov 2013Tariff Regulations, Distribution Code and Supply Code — Amendments, 2013
- Dated 1 Jul 2014Tamil Nadu Electricity Distribution Code Amendments, 2014
- Dated 11 Sep 2014Tamil Nadu Electricity Distribution Code — Amendment, 2014
- Dated 7 Oct 2014Tamil Nadu Electricity Distribution Code — Amendment, 2014
- Dated 23 Jan 2015Tamil Nadu Electricity Distribution Code — Regulation 8 Substitution, 2015
- Dated 30 Aug 2017Tamil Nadu Electricity Distribution Code — FORM-4 Amendment, 2017
- Dated 2 Mar 2018Tamil Nadu Electricity Distribution Code Amendments, 2018
- Dated 18 Dec 2019Tamil Nadu Electricity Distribution Code — Amendment, 2019
- Dated 9 Jun 2020Tamil Nadu Electricity Distribution Code — Amendment to Regulation 26(1)(b), 2020
- Dated 9 Jun 2020Tamil Nadu Electricity Supply Code and Distribution Code — LT/HT 150 kW Amendment, 2020
- Dated 16 Jul 2020Tamil Nadu Electricity Supply Code and Distribution Code — Amendments, 2020
- Dated 16 Jul 2020Tamil Nadu Electricity Distribution Code — Agricultural Service Connection Amendments, 2020
- Dated 24 Dec 2020Tamil Nadu Electricity Supply Code and Distribution Code Amendments, 2021
- Dated 24 Dec 2020Tamil Nadu Electricity Supply Code and Distribution Code Amendment, 2021
- Dated 2 Sep 2023Tamil Nadu Electricity Distribution Code, 2004 — Amendments, 2023
Consolidated copies, for reference (4)
- Dated 31 Jul 2008Tamil Nadu Electricity Distribution Code — Consolidated re-publication as amended up to 31.07.2008
- Dated 31 Dec 2009Tamil Nadu Electricity Distribution Code, as amended up to 31.12.2009 — Consolidated
- Dated 31 Dec 2010Tamil Nadu Electricity Distribution Code — Consolidated re-publication, as amended up to 31-12-2010
- Dated 31 Mar 2024Tamil Nadu Electricity Distribution Code — Consolidated, as amended upto 31-03-2024
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 5 Dec 2012Tamil Nadu Electricity Distribution Code — Draft Amendment (Regulation 38 — Restrictions on Use of Electricity)
- Dated 17 Jul 2013Tamil Nadu Electricity Distribution Code — Regulation 39 Temporary Supply Amendment, 2013 — Draft
- Dated 12 May 2014Draft amendments to the Distribution Code and Supply Code on agricultural supply, 2014
- Dated 25 Mar 2015Tamil Nadu Electricity Supply Code and Distribution Code — Draft Amendments, 2015
- Dated 9 Jul 2019Tamil Nadu Electricity Distribution Code, 2019 — Draft Amendments
- Dated 7 Nov 2019Draft Amendment to the Tamil Nadu Electricity Distribution Code, 2019 — Categories of Supply (Regulation 26)
- Dated 6 Mar 2020Draft Amendment to the Tamil Nadu Electricity Distribution Code — Agricultural Service Connections
- Dated 9 Oct 2020Draft Tamil Nadu Electricity Distribution Code Amendment, 2020
- Dated 27 Apr 2023Tamil Nadu Electricity Distribution Code, 2004 — Draft Amendment, 2023
25 more documents belong here and are not on Voltaic: 25 copies in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of TNERC's website on 29 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.