Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution (Amendment) Code 2005

AmendmentDated 22 Nov 2005Published in the Gazette 7 Dec 2005TNERC / DC / 8-1/ dated 22.11.2005

Amends the Tamil Nadu Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short TNERC notification amending the Tamil Nadu Electricity Distribution Code, 2004. It was issued on 22 November 2005 and published in the Tamil Nadu Government Gazette of 7 December 2005 (p1). It is made under s.181 read with s.46 of the Electricity Act, 2003, and the Commission states it had undergone previous publication (p1). It is styled the "Tamil Nadu Electricity Distribution (Amendment) Code 2005" and comes into force on gazette publication (p2).

The operative content is two amendments. First, a proviso is added below Regulation 27(1) obliging the licensee to refuse supply to an intending consumer who has defaulted on dues to the licensee for any other service connection in that consumer's name (p2). Second, the opening paragraph of Regulation 29(12) is rewritten to set the trigger conditions under which a building or premises seeking LT service connection must provide dedicated electrical accommodation: a total floor area threshold, excluding stilt and basement floors, or an aggregate LT demand threshold (p2). Where triggered, the consumer must provide either an enclosed RCC-roofed electrical room of specified clear floor area and vertical clearance with locking, exhaust fans and cable duct at ground floor, or an equivalent open-to-sky space for a structure-mounted transformer (p2–3).

A further limb requires space to be allotted for a substation or switching station in group housing and commercial complexes above a stated demand level, with those areas shown on the plan; the norms for that space are left to be specified by the Commission (p3). The document contains no repeal or savings clause.

Standard name
Distribution Code
Primary topics
Conditions of supply, New connections and load changes, Distribution system planning and operation

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document