Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution Code, 2004 — Amendment Code, 2006

Tamil Nadu Electricity Distribution (Amendment) Code, 2006

AmendmentDated 20 Jul 2006Published in the Gazette 16 Aug 2006TNERC/DC/8- 5 dated 20-07-2006

Amends the Tamil Nadu Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-clause amendment by the Tamil Nadu Electricity Regulatory Commission to the Tamil Nadu Electricity Distribution Code, 2004, published in the Tamil Nadu Government Gazette (p1–2). The Commission states it is removing certain difficulties in implementing the Code and that the amending regulations were subject to previous publication (p2).

Clause 1 gives the short title — the Tamil Nadu Electricity Distribution (Amendment) Code, 2006 — and provides that it comes into force on the date of publication in the Tamil Nadu Government Gazette (p2). The Gazette issue carrying it is dated 16 August 2006, while the notification itself is dated 20 July 2006 (p1–2).

Clause 2(a) substitutes clause (a) of sub-regulation (14) of regulation 29 of the Code (p2–3). The new clause specifies the electrical room a consumer must provide where metering is indoor: its construction, roof type, clear floor area, vertical clearance between floor and ceiling or beam bottom, locking, exhaust fan and cable duct, the floor on which it is to be located, and that it be fireproof and weatherproof, so that the licensee's equipment can be installed there (p3).

Clause 2(b) substitutes the Note under item 6 of Form 4 in Annexure III of the Code (p3). The new Note specifies the documents that must accompany a service-connection application, distinguishing applicants who own the premises from those who do not, and requiring for non-owners an indemnity bond in Form 6 and a letter accepting a security deposit at twice the normal rate (p3).

Standard name
Distribution Code
Primary topics
Metering, New connections and load changes, Security deposit

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document