Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code and Distribution Code Amendments, 2021

Amendment to the Tamil Nadu Electricity Supply Code.

AmendmentDated 24 Dec 2020Published in the Gazette 27 Jan 2021TNERC/SC/744 dated 2+1 2-2020

Amends the Tamil Nadu Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software, from pages 1 to 22 of 27. Check the regulator's original before you rely on it.

Published in the Tamil Nadu Government Gazette on 27 January 2021 (p1), this issue carries two TNERC amendment notifications — one to the Tamil Nadu Electricity Supply Code and one to the Tamil Nadu Electricity Distribution Code — each with its own explanatory statement. Both notifications are dated 24 December 2020 and signed by the Secretary on 8 January 2021 (p2, p13).

The Supply Code amendment replaces regulation 6 so that "minimum charges" and "fixed charges" mean the same thing — the charges prescribed in the Commission's tariff orders from time to time — and remain payable even where no energy is consumed or supply is disconnected, including by court order; an explanation extends the HT charge basis to LT services at or above a sanctioned demand threshold (pp2–3).

The Distribution Code amendment is the substantive part (pp3–6). It inserts a definition of "Authority" as the Central Electricity Authority (p3); inserts regulation 16(2A) requiring residual current devices on low- and medium-voltage installations including temporary supply, with a second, higher-rated device for fire protection above a load threshold and a sub-division rule to avoid nuisance tripping (p4); reworks regulation 27 so HT, LT, temporary, agricultural and hut applications each use a specified form, and requires planning permission plus Electrical Inspector approval for multi-storeyed buildings above a stated height (p4); rewrites regulation 29(11) and (12) to oblige applicants to provide space or land free of cost for transformers and substations above floor-area or demand thresholds, with room and land norms by voltage level and a methodology for sharing cost differences between outdoor, compact and indoor substations (pp4–6); codifies metering-point location and visibility rules in regulation 29(14)(b), with a proviso for CEO-approved alternatives and applicant-borne check metering (p6); and rewrites regulation 31(3) on extensions, lapsing, forfeiture and force majeure refunds (p6).

Annexure III substitutes Form 1 for LT connections and inserts Form 1A for temporary supply, both adding proof-of-ownership, co-owner consent, planning-approval and RCD declarations (pp7–13). A final Annexure (pp14–22) reproduces the changes as existing text against amended text.

Standard name
Electricity Supply Code, Distribution Code
Primary topics
Electrical safety, New connections and load changes, Connection and miscellaneous charges

Read with this

Read with this: Tamil Nadu Electricity Distribution Code

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

It is also read with: Tamil Nadu Electricity Supply Code (TNESC)

Amends the Tamil Nadu Electricity Supply Code (TNESC).

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document