Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution Code — Agricultural Service Connection Amendments, 2020

Amendments to the Tamil Nadu Electricity Distribution Code

AmendmentDated 16 Jul 2020Published in the Gazette 5 Aug 2020TNERC/DC/8-27 dated 16-07-2020

Amends the Tamil Nadu Electricity Supply Code (TNESC).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This Tamil Nadu Government Gazette notification (No. 32, Part VI—Section 2, dated 5 August 2020, p1) carries two TNERC amendment sets: one to the Tamil Nadu Electricity Supply Code and one to the Tamil Nadu Electricity Distribution Code. The Supply Code amendment survives here only as a fragment on p2, dealing with shifting an agricultural well/bore-well service connection to a new location — conditions where the well is co-owned, that shifting is considered irrespective of the consumer's reason or whether the well still exists, and that a fresh Form-2 application, shifting charges and a new agreement are required before the licensee takes up work.

The Distribution Code amendment (Notification No. TNERC/DC/8-27 dated 16-07-2020, made under s.181 read with s.46 of the Electricity Act 2003) is the substantive body. It rewrites regulation 27(2) into a step-by-step registration and processing procedure for normal-category agricultural applications: registration with a seniority number, written intimation of seniority, a 90-day notice to re-confirm particulars before an estimate is prepared, entry in a readiness register, extension of time up to five years and lapse thereafter, segregation of works into three categories with priority registers, 30-day supply notices, and cancellation plus dismantling of licensee-erected works if supply is not availed within six months (p2–4). The procedure applies only to the 'normal category'; licensees must frame separate procedures for other categories (p4).

Regulation 29(2) is expanded to govern who may obtain connections within a survey number, co-owner connections, separate non-agricultural pumping connections, and changeover switches with deemed approval after fifteen days (p4). Regulation 31 gains a sub-regulation cross-referring agricultural notices to regulation 27(2) (p4), and Annexure III Form-2 is replaced by a new application form (p5–8). The remainder is explanatory: an Explanatory Statement on why the procedure was simplified (p8) and a side-by-side comparative statement (p9–15).

Standard name
Distribution Code, Electricity Supply Code
Primary topics
Agricultural supply, New connections and load changes, Conditions of supply

Read with this

Read with this: Tamil Nadu Electricity Supply Code (TNESC)

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

It is also read with: Tamil Nadu Electricity Distribution Code

Amends the Tamil Nadu Electricity Distribution Code.

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document