This is a TNERC draft notification proposing two changes to regulation 26 of the Tamil Nadu Electricity Distribution Code — the regulation that sorts consumers' supply into categories by phase, voltage and connected load. It is published for comment under s.181(3) of the Electricity Act 2003, with objections due within thirty days of posting on the TNERC website and the stated deadline of 06-12-2019 (p1).
The first amendment rewrites the opening words of regulation 26(1) so that supply "shall be availed by the consumer" under the listed categories, rather than being described as categories of supply "available" to the consumer (p1). The second substitutes clause (b), the three-phase 415/240 V low-tension category, raising the demand ceiling for LT supply from 112 KW to 150 KW (p2). For consumers above 112 KW and up to 150 KW it attaches a proviso: the consumer must provide space for a distribution transformer — on its premises or on private land within 100 metres, relaxable by the Distribution circle officer (Superintending Engineer) to 200 metres; the licensee erects a single-pole transformer and installs it with its switchgear at the licensee's cost; the consumer does the mounting works and the LT-side works up to the meter at its own cost; and the consumer maintains the service line notwithstanding regulation 29(17)–(18) (p2–3). Fixed charges for that band are blended — LT fixed charges on the first 112 KW plus HT demand charges on the balance (p3).
An Explanation protects existing LT consumers above 112 KW and within 150 KW: they may opt to stay on LT subject to those conditions, and those who do not opt pay excess demand charges under regulation 5(2) (p3). The Commission's stated aims are improving the HT/LT line ratio, supporting the Ease of Doing Business programme of the Department of Industrial Policy and Promotion, and giving consumers a choice of supply (p4). Pages 5–7 set the existing and proposed texts side by side.
Read with this
The regulation
- Dated 21 Jul 2004Tamil Nadu Electricity Distribution Code
Amendments and corrections
- Dated 22 Nov 2005Tamil Nadu Electricity Distribution (Amendment) Code 2005
- Dated 23 Feb 2006Tamil Nadu Electricity Distribution Code, 2004 — 2006 Amendment
- Dated 31 May 2006Tamil Nadu Electricity Distribution Code, 2004 — 2006 Amendment
- Dated 14 Jun 2006Tamil Nadu Electricity Distribution Code 2006 — Amendment — point of supply beyond 30 m
- Dated 22 Jun 2006Tamil Nadu Electricity Distribution (Amendment) Code 2006
- Dated 20 Jul 2006Tamil Nadu Electricity Distribution Code, 2004 — Amendment Code, 2006
- Dated 10 Sep 2007Tamil Nadu Electricity Distribution (Amendment) Code, 2007
- Dated 3 Dec 2007Tamil Nadu Electricity Supply Code, Distribution Code and Standard of Performance (Amendment) Regulations 2007
- Dated 8 Feb 2008Tamil Nadu Electricity Distribution Code, 2004 — First Amendment, 2008
- Dated 22 May 2008Tamil Nadu Electricity Distribution Code — Second Amendment, 2008
- Dated 29 Jun 2009Tamil Nadu Electricity Distribution (Amendment) Code, 2009
- Dated 24 Aug 2009Tamil Nadu Electricity Distribution (Amendment) Code, 2009
- Dated 14 Mar 2011Amendment of Clause 51 of the Principal Code
- Dated 17 Feb 2012Tamil Nadu Electricity Distribution (Amendment) Code 2012
- Dated 29 Nov 2012Tamil Nadu Electricity Distribution Code — Amendment, 2012
- Dated 6 Sep 2013Tamil Nadu Electricity Distribution Code, Regulation 39 (Temporary Supply) — Amendment, 2013
- Dated 26 Nov 2013Tariff Regulations, Distribution Code and Supply Code — Amendments, 2013
- Dated 1 Jul 2014Tamil Nadu Electricity Distribution Code Amendments, 2014
- Dated 11 Sep 2014Tamil Nadu Electricity Distribution Code — Amendment, 2014
- Dated 7 Oct 2014Tamil Nadu Electricity Distribution Code — Amendment, 2014
- Dated 23 Jan 2015Tamil Nadu Electricity Distribution Code — Regulation 8 Substitution, 2015
- Dated 30 Aug 2017Tamil Nadu Electricity Distribution Code — FORM-4 Amendment, 2017
- Dated 2 Mar 2018Tamil Nadu Electricity Distribution Code Amendments, 2018
- Dated 18 Dec 2019Tamil Nadu Electricity Distribution Code — Amendment, 2019
- Dated 9 Jun 2020Tamil Nadu Electricity Distribution Code — Amendment to Regulation 26(1)(b), 2020
- Dated 9 Jun 2020Tamil Nadu Electricity Supply Code and Distribution Code — LT/HT 150 kW Amendment, 2020
- Dated 16 Jul 2020Tamil Nadu Electricity Supply Code and Distribution Code — Amendments, 2020
- Dated 16 Jul 2020Tamil Nadu Electricity Distribution Code — Agricultural Service Connection Amendments, 2020
- Dated 24 Dec 2020Tamil Nadu Electricity Supply Code and Distribution Code Amendments, 2021
- Dated 24 Dec 2020Tamil Nadu Electricity Supply Code and Distribution Code Amendment, 2021
- Dated 2 Sep 2023Tamil Nadu Electricity Distribution Code, 2004 — Amendments, 2023
Consolidated copies, for reference (4)
- Dated 31 Jul 2008Tamil Nadu Electricity Distribution Code — Consolidated re-publication as amended up to 31.07.2008
- Dated 31 Dec 2009Tamil Nadu Electricity Distribution Code, as amended up to 31.12.2009 — Consolidated
- Dated 31 Dec 2010Tamil Nadu Electricity Distribution Code — Consolidated re-publication, as amended up to 31-12-2010
- Dated 31 Mar 2024Tamil Nadu Electricity Distribution Code — Consolidated, as amended upto 31-03-2024
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 5 Dec 2012Tamil Nadu Electricity Distribution Code — Draft Amendment (Regulation 38 — Restrictions on Use of Electricity)
- Dated 17 Jul 2013Tamil Nadu Electricity Distribution Code — Regulation 39 Temporary Supply Amendment, 2013 — Draft
- Dated 12 May 2014Draft amendments to the Distribution Code and Supply Code on agricultural supply, 2014
- Dated 25 Mar 2015Tamil Nadu Electricity Supply Code and Distribution Code — Draft Amendments, 2015
- Dated 9 Jul 2019Tamil Nadu Electricity Distribution Code, 2019 — Draft Amendments
- Dated 6 Mar 2020Draft Amendment to the Tamil Nadu Electricity Distribution Code — Agricultural Service Connections
- Dated 9 Oct 2020Draft Tamil Nadu Electricity Distribution Code Amendment, 2020
- Dated 27 Apr 2023Tamil Nadu Electricity Distribution Code, 2004 — Draft Amendment, 2023
25 more documents belong here and are not on Voltaic: 25 copies in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.