Draft Amendment to the Tamil Nadu Electricity Distribution Code, 2019 — Categories of Supply (Regulation 26)

Draft Notification No. TNERC/DC/8 –……. dated .11.2019.

Draft amendmentDated 7 Nov 2019TNERC/DC/8 dated .11.2019

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Distribution Code — Amendment, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a TNERC draft notification proposing two changes to regulation 26 of the Tamil Nadu Electricity Distribution Code — the regulation that sorts consumers' supply into categories by phase, voltage and connected load. It is published for comment under s.181(3) of the Electricity Act 2003, with objections due within thirty days of posting on the TNERC website and the stated deadline of 06-12-2019 (p1).

The first amendment rewrites the opening words of regulation 26(1) so that supply "shall be availed by the consumer" under the listed categories, rather than being described as categories of supply "available" to the consumer (p1). The second substitutes clause (b), the three-phase 415/240 V low-tension category, raising the demand ceiling for LT supply from 112 KW to 150 KW (p2). For consumers above 112 KW and up to 150 KW it attaches a proviso: the consumer must provide space for a distribution transformer — on its premises or on private land within 100 metres, relaxable by the Distribution circle officer (Superintending Engineer) to 200 metres; the licensee erects a single-pole transformer and installs it with its switchgear at the licensee's cost; the consumer does the mounting works and the LT-side works up to the meter at its own cost; and the consumer maintains the service line notwithstanding regulation 29(17)–(18) (p2–3). Fixed charges for that band are blended — LT fixed charges on the first 112 KW plus HT demand charges on the balance (p3).

An Explanation protects existing LT consumers above 112 KW and within 150 KW: they may opt to stay on LT subject to those conditions, and those who do not opt pay excess demand charges under regulation 5(2) (p3). The Commission's stated aims are improving the HT/LT line ratio, supporting the Ease of Doing Business programme of the Department of Industrial Policy and Promotion, and giving consumers a choice of supply (p4). Pages 5–7 set the existing and proposed texts side by side.

Standard name
Distribution Code
Primary topics
Conditions of supply, Wheeling and retail supply tariff

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document