Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution Code Amendments, 2014

Amendments to the Tamil Nadu Electricity Distribution Code

AmendmentDated 1 Jul 2014Published in the Gazette 6 Aug 2014Notification No. TNERC/DC/8-19 dated 01-07-2014

Amends the Tamil Nadu Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the TNERC notification amending the Tamil Nadu Electricity Distribution Code, printed in the Tamil Nadu Government Gazette of 6 August 2014 under Gazette No. 30, Part VI—Section 2 (p1). The notification itself is dated 1 July 2014 and numbered TNERC/DC/8-19 (p2). The contents page shows the issue carrying two Commission notifications — Supply Code amendments and Distribution Code amendments — plus unrelated government examination notices.

The operative part substitutes five provisions (pp2–3). Regulation 27(14) tightens the conditions for giving more than one service connection at a single door or sub-door number, now requiring permanent physical or electrical segregation and covering intended as well as existing occupants. Regulation 31(3) states what follows when an intending consumer does not take supply within the stipulated period: further notice for HT and LT applicants, lapse or cancellation of the application and termination of the agreement, forfeiture of service connection charges and of the security deposit/development charges other than the meter caution deposit, and refund of deposits where the consumer is prevented by force majeure. Regulation 37 is replaced in full with a cost-recovery scheme for shifting service connections — what the estimate must contain, percentage add-ons for dismantling, transport and erection, credits due to the consumer for reusable and scrap materials, and reconciliation against a revised estimate with refund or recovery of the difference. Regulation 51(1)–(2) is replaced to reconstitute the Code Review Panel, changing its chair, widening licensee and consumer-sector representation, and fixing a three-year, non-renewable tenure for the consumer, EHT/HT and open access members. A sentence in Annexure III Form-7 (L.T. Agreement for Industrial/Agricultural Services) permitting use of energy outside the premises is omitted.

The changes are explained in an Explanatory Statement attributing them to suggestions of the Code Review Panel (pp3–4), and each is then shown side by side against the provision it replaces (pp4–7).

Standard name
Distribution Code
Primary topics
New connections and load changes, Connection and miscellaneous charges, Consumer representation

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document