Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution Code, 2004 — 2006 Amendment

Tamil Nadu Electricity Distribution (Amending) Code 2006

AmendmentDated 23 Feb 2006Published in the Gazette 15 Mar 2006In force from 23 Feb 2006TNERC/DC/8-2/ dated 23.02.2006

Amends the Tamil Nadu Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short TNERC amending regulation that inserts a single proviso into the Tamil Nadu Electricity Distribution Code. Page 1 is the Tamil Nadu Government Gazette cover (Chennai, Wednesday, 15 March 2006) carrying notifications by heads of departments; the operative text runs across pages 2–3.

The preamble (p2) records that amending the Distribution Code was considered necessary to remove difficulties in implementing the Code, and that the amending regulation was subject to previous publication and had gone through such publication. The Commission specifies the amendment under section 181 of the Electricity Act 2003.

Clause 1 (p2) gives the short title — Tamil Nadu Electricity Distribution (Amending) Code 2006 — and fixes commencement at 23.02.2006, the same date as the notification, ahead of the 15 March 2006 Gazette. Clause 2 (p2–3) inserts a proviso under clause (b) of sub-regulation 14 of Regulation 29 of the parent Code, empowering the Chief Executive Officer of the Licensee to approve a point of supply located beyond 30 metres from the main gate, where the CEO is satisfied the place is easily accessible and visible to the licensee's officials, is safe and secure, and is not susceptible to mal practice — with no compromise on technical grounds in relaxing the distance criterion. The order is signed by the Commission's Secretary (p3).

What the document does, in effect, is delegate a siting relaxation to the licensee's CEO under stated conditions. It sets no tariffs, fees or technical parameters.

Standard name
Distribution Code
Primary topics
New connections and load changes, Conditions of supply

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document