Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code and Distribution Code — LT/HT 150 kW Amendment, 2020

Amendments to the Tamil Nadu Electricity Supply Code

AmendmentDated 9 Jun 2020Published in the Gazette 1 Jul 2020Notification No. TNERC/SC/7 -41 dated 09-06-2020

Amends the Tamil Nadu Electricity Supply Code (TNESC).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This Gazette issue (No. 27, 1 July 2020, Part VI—Section 2) carries two TNERC amendment notifications, both dated 9 June 2020 and signed 18 June 2020, that shift the boundary between LT and HT supply in Tamil Nadu and rework excess-demand charges (p1–2).

The first notification amends the Tamil Nadu Electricity Supply Code under s.181 read with s.50 (p2). Regulation 3(1)(b) is recast so that three-phase 4-wire 415 V LT supply covers connected load above 4000 W up to a demand of 150 kW, in place of the earlier 112 kW ceiling (p2). A proviso attaches conditions to the band above 112 kW up to 150 kW: the consumer provides free space for a distribution transformer (on the premises or on private land within 50 m), bears the cost of mounting arrangements and of the works from the DT to the meter including any internal HT line, while the licensee installs the DT and its accessories at its own cost. Demand charges in that band follow the HT rate per kVA applied on a per-kW basis without conversion, energy charges stay at LT rates, and DT losses are borne by the consumer under Reg 7(7) (p2–3). Two Explanations tell existing and new consumers above 112 kW how to opt into LT or be required to take HT supply (p2–3).

The same notification rewrites Regulation 5(2)(ii)(c), splitting excess-demand charges by sanctioned-demand band (up to 112 kW; above 112 kW up to 150 kW) and by the number of repeat occurrences, and adds new sub-clauses (III) and (IV) under which the licensee revises the load sanction after a second occurrence and issues notice for conversion of LT service to HT after a third (p3–4). Temporary-supply excess demand charges are brought into line with the general clauses (p4). An Explanatory Statement gives the aims: improving the HT/LT line ratio, facilitating supply under the Ease of Doing Business programme of the Department of Industrial Policy and Promotion, and giving consumers a choice of supply (p4).

Pages 5–13 reprint the same changes as a side-by-side statement of existing and substituted text for Supply Code regulations 3(1) and 5(2). Page 13 begins the second notification — the mirror amendment to Regulation 26(1) of the Tamil Nadu Electricity Distribution Code under s.181 read with s.46 — which the copy supplied cuts off mid-proviso.

Standard name
Electricity Supply Code, Distribution Code
Primary topics
Conditions of supply, New connections and load changes, Connection and miscellaneous charges

Read with this

Read with this: Tamil Nadu Electricity Supply Code (TNESC)

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

It is also read with: Tamil Nadu Electricity Distribution Code

Amends the Tamil Nadu Electricity Distribution Code.

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document