Tamil Nadu Electricity Distribution Code — Amendment to Regulation 26(1)(b), 2020

Amendments to the Tamil Nadu Electricity Distribution Code

AmendmentDated 9 Jun 2020TNERC/DC/8 – 26 dated 09-06-2020

Amends the Tamil Nadu Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a TNERC notification amending the Tamil Nadu Electricity Distribution Code, and it does one thing: it re-draws the boundary between low-tension (LT) and high-tension (HT) supply for medium-sized consumers. The opening words of regulation 26(1) are recast to say supply 'shall be availed by the consumer' under listed categories, and clause (b) is substituted so that three-phase 4-wire 415/240 V LT supply now runs to a total connected load above 4000 watts up to a demand of 150 KW (pp1, 3). Previously that LT ceiling was 112 KW (p3), so the amendment opens the 112–150 KW band to LT supply.

Availing LT supply in that band is conditional. A proviso to clause (b) sets five conditions: the consumer gives space for the licensee's distribution transformer free of cost, inside the premises or on private land within a 50 m radius with free access; where possible the licensee erects a single-pole DT with mounting arrangements built by the consumer at the consumer's cost; the DT and its accessories (AB switch, HG fuse, DT structure/pole) are installed by the licensee at the licensee's cost; works from the DT to the consumer's meter, including any HT line inside the premises, are at the consumer's cost; and billing is hybrid — fixed/demand charges at the relevant HT rate applied per KW without converting KW to kVA, energy charges at LT rates, with DT losses borne by these LT consumers per regulation 7(7) of the Supply Code (pp1–2, 4–5).

Two Explanations deal with transition: existing LT consumers above 112 KW may opt for LT under those conditions or face excess demand charges under the Supply Code; new consumers above 112 KW who cannot meet the conditions must take HT supply, and the same applies to existing consumers at or below 112 KW who want more (pp2, 5–6). The stated aim is a better HT/LT line ratio, Ease of Doing Business, and consumer choice (p2). Pages 3–6 are a comparison table of old and new text.

Standard name
Distribution Code
Primary topics
Conditions of supply, New connections and load changes, Connection and miscellaneous charges

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document