TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution Code, 2004 — Draft Amendment, 2023

DRAFT AMENDMENT TO REGULATIONS OF TAMIL NADU ELECTRICITY DISTRIBUTION CODE, 2004

Draft amendmentDated 27 Apr 2023TNERC/DC/ – ....... dated xx.04.2023

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Distribution Code, 2004 — Amendments, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Tamil Nadu Electricity Regulatory Commission draft amendment to the Tamil Nadu Electricity Distribution Code, 2004, published for objections and suggestions, with comments invited by 26.05.2023 (p1). It is an amendment package, not a final notification: it sets out 24 proposed changes to the Code, an explanatory statement and a comparative annexure. The preamble says it is proposed under s.181 read with s.46 of the Electricity Act, 2003 and published as required by s.181(3) (p1).

Amendments 1–6 (pp2–5) deal with definitions and requisitions for supply. They replace the residual definition clause; rewrite the distribution licensee’s duty to supply, including the no-augmentation timeline, charges and refusal for dues; change agricultural application processing so well/bore-well digging is not insisted on at registration and seniority is linked to the readiness register; and prescribe application channels, registration, defect rectification, acknowledgement, tracking, cancellation and refund. A new clause permits multiple service connections/tariff IDs for common facilities in multi-tenement domestic premises as provided in tariff orders.

Amendments 7–11 (pp5–8) concern service lines and substation space under Regulation 29. They set when applicants must allot land for substations, revise the land-dimension table, allow indoor/partial-indoor/GIS alternatives with cost-difference sharing, require Commission approval for unique large projects, and revise service-line estimate and ownership/maintenance rules.

Amendments 12–15 (pp8–9) cover test-report retention, minimum charges when supply is availed during the notice period, and settlement of security deposit and refunds on permanent disconnection or termination. Amendments 16–19 (pp10–11) revise temporary-supply metering and security deposit, service-connection charges and consumer-provided service materials. Amendments 20–24 (pp11–12) add identity-proof and PAN requirements to Annexure III forms.

The explanatory statement (pp13–14) gives reasons: alignment with the Electricity (Rights of Consumers) Rules, 2020 and Code Review Panel recommendations, faster supply, clearer application processing, substation land options, disconnection refunds and development charges. The comparative annexure (pp15–30) sets existing and proposed text side by side for the regulations and forms.

Standard name
Distribution Code
Primary topics
New connections and load changes, Conditions of supply, Connection and miscellaneous charges

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document