Draft amendments to the Distribution Code and Supply Code on agricultural supply, 2014

Draft of amendments to the Tamil Nadu Electricity Distribution Code and Supply Code on Supply to Agricultural Category

Draft codeDated 12 May 2014TNERC/DC/8 dated -05-2014

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Distribution Code Amendments, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This document bundles two draft amendment notifications that the Tamil Nadu Electricity Regulatory Commission published for public comment in May 2014, with objections or suggestions invited by 11 June 2014 and the drafts to be taken up after thirty days from publication on the TNERC website (p1, p6). Both are preambles-plus-text drafts only; neither states when it would come into force.

The larger draft, TNERC/DC/8, proposes changes to the Tamil Nadu Electricity Distribution Code under section 181 read with section 46 of the Electricity Act 2003, and its subject is supply to the agricultural category. It adds a rule that applications go to a 'designated engineer' whose details the licensee must display for each category of supply at section offices, and it substitutes regulation 27(2) with a full agricultural-connection regime: Form 2 applications, applications allowed before a well or borewell is dug, seniority numbers assigned category-wise at registration and kept at divisional level, waiting periods to be broadly equalised across divisions and circles, the licensee's terminal LT pole treated as the distribution main, a sealed change-over switch for other agricultural and allied uses within contracted load (simultaneous use prohibited), readiness notices based on seniority, first-come-first-served release, and permission for name transfer and shifting even before supply, with a tie-break rule (p1–2).

Further clauses touch eligibility and equipment: minimum land area per connection and rules for more than one connection within a survey field or in a jointly owned well (p3); BIS/BEE certification and nameplate requirements for motors and pumpsets in LT connections (p3); and automatic lapse of an application if supply is not availed within two years of the notice period expiring (p3). A new Form 2 application form for agricultural service connections, with its field list, ownership proofs and consent/indemnity requirements, replaces the existing form in Annexure III (p3–5).

The short second draft, TNERC/SC/7, amends regulation 5(6) of the Tamil Nadu Electricity Supply Code under section 181 read with section 50, substituting a clause so that shifting of an existing service connection other than an agricultural one, involving a change of door number, sub-door number or survey field number, is treated as a new service connection (p6).

Standard name
Distribution Code, Electricity Supply Code
Primary topics
Agricultural supply, New connections and load changes, Conditions of supply

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document