Tamil Nadu Electricity Distribution Code Amendments, 2018

Amendments to the Tamil Nadu Electricity Distribution Code

AmendmentDated 2 Mar 2018Published in the Gazette 4 Apr 2018Notification No. TNERC/DC/8-24 dated 02-03-2018

Amends the Tamil Nadu Electricity Supply Code (TNESC).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is one part-issue of the Tamil Nadu Government Gazette (Part VI—Section 2, Chennai, Wednesday, April 4, 2018) carrying two separate amendment notifications of the Tamil Nadu Electricity Regulatory Commission, both dated 02-03-2018 and signed on 20 March 2018 (p1, p2, p6, p27).

The first — Notification No. TNERC/DC/8-24, published as No.VI(2)/43/2018 — amends the Tamil Nadu Electricity Distribution Code under s.181 read with s.46 of the Electricity Act 2003, after prior draft publication under s.181(3) (p2). It rewrites regulation 29 on service lines: the notice to an applicant to agree the point of supply, cut-out/circuit-breaker and meter position; the rule that service mains must be visible and accessible up to the metering point for *all* connections, overhead or underground; the normal ground-floor location of connections in storied buildings; and a new power to raise meter height in flood-prone areas, at a level the Engineer determines (p2). It also changes the regulation 29(12)(ii) land table — substituting "850 (indoor)" for "1520 (indoor)" against the 33 kV sub-station entry (p2, p8) — replaces the LT, agriculture and hut service application forms in Annexure III with expanded formats (p2–6, 9–13), and inserts clause 4A in the HT agreement Form-8, requiring consumers with harmonic-rich, low-power-factor loads to install correction equipment (p6, p13, p27).

An Explanatory Statement (p7) gives the five reasons for the changes — visibility of service mains, flood-safe meter height, reduced sub-station land, revised forms and harmonic correction — attributing them to a proposal from the Code Review Panel. A comparative statement (pp7–8) reproduces old and new text clause by clause.

The second notification — Amendments to the Tamil Nadu Electricity Supply Code, No. TNERC/SC/7-39, No.VI(2)/44/2018, made under s.181 read with s.50 — starts only at p27 and is cut off mid-clause: it omits regulation 4(1)(vi) and substitutes regulation 5(2)(iii) on excess demand charges for temporary supply, but the substituted text does not survive in this copy (p27). The Gazette contents table (p1) lists only the Distribution Code amendments.

Standard name
Distribution Code, Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Metering

Read with this

Read with this: Tamil Nadu Electricity Supply Code (TNESC)

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

It is also read with: Tamil Nadu Electricity Distribution Code

Amends the Tamil Nadu Electricity Distribution Code.

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document