Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution Code — Amendment, 2014

Amendment to the Tamil Nadu Electricity Distribution code

AmendmentDated 7 Oct 2014Published in the Gazette 3 Dec 2014Notification No. TNERC/DC/8-21 dated 7-10-2014

Amends the Tamil Nadu Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

TNERC's notification TNERC/DC/8-21, dated 7 October 2014, amends the Tamil Nadu Electricity Distribution Code. It was published in Tamil Nadu Government Gazette No. 46 on 3 December 2014 as Part VI—Section 2, and was made under Section 181 read with Section 46 of the Electricity Act, 2003, the draft having been published under Section 181(3) (p2).

The operative text amends Regulation 27 in six ways (p2). It substitutes sub-regulation (3) to fix which application form is used for each category of new connection — FORM-4 for HT, and FORM-1, 2 and 3 for LT (other than Agriculture and Hut), LT Agriculture and LT Hut respectively — and adds a note requiring licensees to acknowledge requisitions in writing and to register or return defective applications without registration (p2). Sub-regulation (4) is replaced to prescribe what a non-owner applicant must produce: a consent letter in FORM-5 of Annexure III, or, if the owner is unavailable or refuses, valid proof of occupancy plus an indemnity bond in FORM-6 and a security deposit at twice the normal rate, with an Explanation listing what counts as valid proof (p2). Sub-regulations (6) and (7) are omitted (p2). Sub-regulation (12) is replaced to require an NOC from the concerned Tamil Nadu Government officer for supply to Poromboke/Government land, again with indemnity bond and double security deposit (p2). A new sub-regulation (15A) allows only one service connection per person, establishment or entity in a premises or contiguous premises, notwithstanding sub-regulations (14) and (15), even where there is permanent physical segregation (p2). The Explanation to sub-regulation (16) is replaced to define 'other compliances' by reference to the Annexure III forms and court decrees or orders (p2).

The second limb rewrites the Annexure III forms (p3–7): FORM-1 for LT service connection except agriculture and hut, FORM-3 for hut service in Panchayats, and FORM-4 for HT service connections including additional demand exceeding 63 kVA, each with the documents that must accompany the application and the licensee-side entries.

The gazette contents also list an Errata to Notification at page 626.

Standard name
Distribution Code
Primary topics
New connections and load changes, Security deposit

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document