TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution (Amendment) Code 2012

AmendmentDated 17 Feb 2012Published in the Gazette 23 Mar 2011TNERC/DC/8 – 15 dated 17-02-2012

Amends the Tamil Nadu Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

TNERC's Notification No. TNERC/DC/8–15, dated 17-02-2012, is a three-clause amendment to the Tamil Nadu Electricity Distribution Code (p1). It is made under section 181 read with section 46 of the Electricity Act 2003, after the required previous publication (p1).

Clause 1 names it the Tamil Nadu Electricity Distribution (Amendment) Code 2012 and ties commencement to the date of its publication in the Tamil Nadu Government Gazette (p1–2). The Gazette masthead printed on page 1 carries a date earlier than the notification date, so the actual commencement date cannot be read off the document.

Clause 2 replaces Regulation 26 of the Principal Code in full (p2–3). The substituted regulation sets out the categories of supply by voltage and load/demand band — single-phase and three-phase low-tension supply, then 11 kV/22 kV, 33 kV, 110 kV and 230 kV — including a minimum demand for the first high-tension band, an LTCT metering trigger for larger LT connections, and an election right for small connected loads. It also allows existing service connections that do not conform to those bands to be converted up or down with the consumer's and licensee's mutual consent, subject to line/cable and transformer capacity and a cost-benefit analysis, and requires a consumer who opts for a higher voltage than its demand warrants to bear the extra cost to the licensee (p2–3).

Clause 3 inserts sub-regulation (1A) into Regulation 32, requiring ABT-compliant meters able to record export and import, installed at both the generator and consumer ends, for open access consumers, by reference to the CEA (Installation and Operation of Meters) Regulations, 2006 (p3).

Standard name
Distribution Code
Primary topics
Conditions of supply, New connections and load changes, Metering

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document