Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution Code, 2004 — First Amendment, 2008

Tamil Nadu Electricity Distribution (First Amendment) Code, 2008

AmendmentDated 8 Feb 2008TNERC/DC/8-8 dated 8.2.2008

Amends the Tamil Nadu Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is TNERC's first amending instrument to the Tamil Nadu Electricity Distribution Code, the 2004 code that governs the distribution licensee's relationship with consumers. Issued as Notification No. TNERC/DC/8-8 dated 8.2.2008 under section 86 of the Electricity Act 2003, it states it comes into force on the date of its publication in the Tamil Nadu Government Gazette (the Gazette date itself is not printed) (p1).

The document is a clause-by-clause rewrite of the Principal Code rather than a fresh code. Regulation 1 gives the short title and the Gazette-linked commencement (p1). Regulation 2 substitutes the definition of "Engineer" — the licensee's officer in charge of a local area of supply, including persons authorised by him — and is the only defined term touched (p2).

The bulk of the amendments (items 3-23, pp2-9) substitute, insert, delete or correct wording across the operative regulations: the Commission's power over electricity procurement; system-planning data exchange; solutions for operational problems such as low voltage, short-circuit withstand, power swings and protection selectivity; terminology alignment ("non-conventional" replaced by "renewable", drafting and grammar fixes throughout); earthing and protection requirements for the distribution system; and, notably, wholesale substitution of regulation 11 to make metering at substations, generating stations and higher-voltage consumers conform to the Tamil Nadu Electricity Grid Code (p4).

Substantive consumer-facing changes include new service-connection rules (consumer's installation must comply with section 53; responsibility for maintenance on consumer premises lies with the consumer; treatment of excess connected capacity), meter purchase and ownership, termination intimation to consumers, revised shifting-charge cost components with arrears payable first, and a substituted regulation 42 deeming the consumer to know all applicable Acts, Rules, Regulations and Notifications (pp7-9). One clause renumbers regulation 13 as 14 (p4).

Items 24 and 25 amend Form 7 (the supply agreement) — defective/faulty meter assessment, meter-card reading entry, tariff and minimum payment, notice periods, security deposit wording, and a re-laid-out premises/supply/connected-load description — and Form 8, adding a three-month supply-availment deadline with a further three-month extension on advance monthly minimum and consequent cancellation and forfeiture (except meter security deposit), plus realignment of the signature block (pp9-12).

Standard name
Distribution Code
Primary topics
Conditions of supply, Metering, New connections and load changes

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document