Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution Code — Consolidated re-publication, as amended up to 31-12-2010

Tamil Nadu Electricity Distribution Code

Consolidated copyDated 31 Dec 2010TNERC/DC/8-13 dated 07-01-2010

A consolidated copy of the Tamil Nadu Electricity Distribution Code, published by TNERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software, from pages 1 to 17 of 50. Check the regulator's original before you rely on it.

This is the consolidated, re-published Tamil Nadu Electricity Distribution Code, issued by TNERC as Notification No. TNERC/DC/8-13 dated 07-01-2010 (p1). It gathers the original 2004 Code (Notification TNERC/DC/8/1, dated 21-07-2004) together with thirteen amending codes and regulations of 2005–2009, so that licensees, consumers and the public can read one up-to-date text (p1–2).

Chapter 1 (p2–4) carries the short title and commencement and the definitions: voltage bands for LT/HT/EHT, connected, contracted and permitted demand, maximum demand, load factor, power factor, operational boundary, control person, and the roles of SLDC and SSLDC. Chapter 2 (p4–5) lists the entities in distribution — SLDC, SSLDC, STU, distribution licensees and the Commission — and their functions. Chapter 3 (p5–9) is the planning chapter: objectives and framework for distribution system planning, the stages of network expansion planning, load forecasting and load research duties, load and system data exchange (with a 1 MW threshold for consumer data, Annexures I and II), forecast methodology, planning criteria, substation design, line clearances and earthing. Chapter 4 (p10–11) sets connectivity conditions — minimum technical and design criteria for anyone connected or seeking connection, interfacing of small renewable and captive generators, protection coordination including EHT consumers, labelling, metering, communication, voltage/frequency/power factor obligations and demand-side management. Chapter 5 (p11–16) is operations: demand estimation to SLDC, planned outages, contingency and black-start procedures, load shedding and rolling blackouts, safety coordination and Line Clear Permits, protections for railways and telegraph lines (ss.159–160), accident and major incident reporting, preventive maintenance, tools, training and R&D. Chapter 6 (p16–17) begins the terms and conditions of supply — declared voltages, categories of supply keyed to load thresholds, and requisitions for supply reproducing s.43, with the prescribed application forms in Annexure III.

Standard name
Distribution Code
Primary topics
Distribution system planning and operation, Conditions of supply, New connections and load changes

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (3)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document