TNERC · Tamil Nadu Electricity Regulatory Commission
Tamil Nadu Electricity Distribution Code — Consolidated re-publication, as amended up to 31-12-2010
Tamil Nadu Electricity Distribution Code
Consolidated copyDated 31 Dec 2010TNERC/DC/8-13 dated 07-01-2010
A consolidated copy of the Tamil Nadu Electricity Distribution Code, published by TNERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.
Summary
Summary written by software, from pages 1 to 17 of 50. Check the regulator's original before you rely on it.
This is the consolidated, re-published Tamil Nadu Electricity Distribution Code, issued by TNERC as Notification No. TNERC/DC/8-13 dated 07-01-2010 (p1). It gathers the original 2004 Code (Notification TNERC/DC/8/1, dated 21-07-2004) together with thirteen amending codes and regulations of 2005–2009, so that licensees, consumers and the public can read one up-to-date text (p1–2).
Chapter 1 (p2–4) carries the short title and commencement and the definitions: voltage bands for LT/HT/EHT, connected, contracted and permitted demand, maximum demand, load factor, power factor, operational boundary, control person, and the roles of SLDC and SSLDC. Chapter 2 (p4–5) lists the entities in distribution — SLDC, SSLDC, STU, distribution licensees and the Commission — and their functions. Chapter 3 (p5–9) is the planning chapter: objectives and framework for distribution system planning, the stages of network expansion planning, load forecasting and load research duties, load and system data exchange (with a 1 MW threshold for consumer data, Annexures I and II), forecast methodology, planning criteria, substation design, line clearances and earthing. Chapter 4 (p10–11) sets connectivity conditions — minimum technical and design criteria for anyone connected or seeking connection, interfacing of small renewable and captive generators, protection coordination including EHT consumers, labelling, metering, communication, voltage/frequency/power factor obligations and demand-side management. Chapter 5 (p11–16) is operations: demand estimation to SLDC, planned outages, contingency and black-start procedures, load shedding and rolling blackouts, safety coordination and Line Clear Permits, protections for railways and telegraph lines (ss.159–160), accident and major incident reporting, preventive maintenance, tools, training and R&D. Chapter 6 (p16–17) begins the terms and conditions of supply — declared voltages, categories of supply keyed to load thresholds, and requisitions for supply reproducing s.43, with the prescribed application forms in Annexure III.
Read with this
The regulation
- Dated 21 Jul 2004Tamil Nadu Electricity Distribution Code
Amendments and corrections
- Dated 22 Nov 2005Tamil Nadu Electricity Distribution (Amendment) Code 2005
- Dated 23 Feb 2006Tamil Nadu Electricity Distribution Code, 2004 — 2006 Amendment
- Dated 31 May 2006Tamil Nadu Electricity Distribution Code, 2004 — 2006 Amendment
- Dated 14 Jun 2006Tamil Nadu Electricity Distribution Code 2006 — Amendment — point of supply beyond 30 m
- Dated 22 Jun 2006Tamil Nadu Electricity Distribution (Amendment) Code 2006
- Dated 20 Jul 2006Tamil Nadu Electricity Distribution Code, 2004 — Amendment Code, 2006
- Dated 10 Sep 2007Tamil Nadu Electricity Distribution (Amendment) Code, 2007
- Dated 3 Dec 2007Tamil Nadu Electricity Supply Code, Distribution Code and Standard of Performance (Amendment) Regulations 2007
- Dated 8 Feb 2008Tamil Nadu Electricity Distribution Code, 2004 — First Amendment, 2008
- Dated 22 May 2008Tamil Nadu Electricity Distribution Code — Second Amendment, 2008
- Dated 29 Jun 2009Tamil Nadu Electricity Distribution (Amendment) Code, 2009
- Dated 24 Aug 2009Tamil Nadu Electricity Distribution (Amendment) Code, 2009
- Dated 14 Mar 2011Amendment of Clause 51 of the Principal Code
- Dated 17 Feb 2012Tamil Nadu Electricity Distribution (Amendment) Code 2012
- Dated 29 Nov 2012Tamil Nadu Electricity Distribution Code — Amendment, 2012
- Dated 6 Sep 2013Tamil Nadu Electricity Distribution Code, Regulation 39 (Temporary Supply) — Amendment, 2013
- Dated 26 Nov 2013Tariff Regulations, Distribution Code and Supply Code — Amendments, 2013
- Dated 1 Jul 2014Tamil Nadu Electricity Distribution Code Amendments, 2014
- Dated 11 Sep 2014Tamil Nadu Electricity Distribution Code — Amendment, 2014
- Dated 7 Oct 2014Tamil Nadu Electricity Distribution Code — Amendment, 2014
- Dated 23 Jan 2015Tamil Nadu Electricity Distribution Code — Regulation 8 Substitution, 2015
- Dated 30 Aug 2017Tamil Nadu Electricity Distribution Code — FORM-4 Amendment, 2017
- Dated 2 Mar 2018Tamil Nadu Electricity Distribution Code Amendments, 2018
- Dated 18 Dec 2019Tamil Nadu Electricity Distribution Code — Amendment, 2019
- Dated 9 Jun 2020Tamil Nadu Electricity Distribution Code — Amendment to Regulation 26(1)(b), 2020
- Dated 9 Jun 2020Tamil Nadu Electricity Supply Code and Distribution Code — LT/HT 150 kW Amendment, 2020
- Dated 16 Jul 2020Tamil Nadu Electricity Supply Code and Distribution Code — Amendments, 2020
- Dated 16 Jul 2020Tamil Nadu Electricity Distribution Code — Agricultural Service Connection Amendments, 2020
- Dated 24 Dec 2020Tamil Nadu Electricity Supply Code and Distribution Code Amendments, 2021
- Dated 24 Dec 2020Tamil Nadu Electricity Supply Code and Distribution Code Amendment, 2021
- Dated 2 Sep 2023Tamil Nadu Electricity Distribution Code, 2004 — Amendments, 2023
Consolidated copies, for reference (3)
- Dated 31 Jul 2008Tamil Nadu Electricity Distribution Code — Consolidated re-publication as amended up to 31.07.2008
- Dated 31 Dec 2009Tamil Nadu Electricity Distribution Code, as amended up to 31.12.2009 — Consolidated
- Dated 31 Mar 2024Tamil Nadu Electricity Distribution Code — Consolidated, as amended upto 31-03-2024
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 5 Dec 2012Tamil Nadu Electricity Distribution Code — Draft Amendment (Regulation 38 — Restrictions on Use of Electricity)
- Dated 17 Jul 2013Tamil Nadu Electricity Distribution Code — Regulation 39 Temporary Supply Amendment, 2013 — Draft
- Dated 12 May 2014Draft amendments to the Distribution Code and Supply Code on agricultural supply, 2014
- Dated 25 Mar 2015Tamil Nadu Electricity Supply Code and Distribution Code — Draft Amendments, 2015
- Dated 9 Jul 2019Tamil Nadu Electricity Distribution Code, 2019 — Draft Amendments
- Dated 7 Nov 2019Draft Amendment to the Tamil Nadu Electricity Distribution Code, 2019 — Categories of Supply (Regulation 26)
- Dated 6 Mar 2020Draft Amendment to the Tamil Nadu Electricity Distribution Code — Agricultural Service Connections
- Dated 9 Oct 2020Draft Tamil Nadu Electricity Distribution Code Amendment, 2020
- Dated 27 Apr 2023Tamil Nadu Electricity Distribution Code, 2004 — Draft Amendment, 2023
25 more documents belong here and are not on Voltaic: 25 copies in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.