Schedule of Charges and Procedure under the Supply Code and Performance Standards Regulations, 2017 — Order

Schedule of Charges and the procedure under Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017

OrderDated 31 Aug 2017F.17(85)/Engg./DERC/2017-18/5767 dated 31.8.2017

Made under the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the DERC order that fills in the operational detail of the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017. Issued on 31.8.2017 under Regulation 84 of those Regulations, it prescribes the schedule of charges licensees may levy and the procedures they must follow, and it runs from the date the 2017 Supply Code Regulations take effect and continues till revised (p14).

The opening paragraphs translate the Regulations into practice. Paras 1–2 set the voltage at which connections are given by load/contract-demand band, preserve existing connections at a variance, give mid-size applicants a choice of LT or HT, and list the application forms (pp1–2). Paras 3–4 cover security deposit by tariff category, bank-guarantee validity and renewal, and the interest payable on deposits, with the pre-2017 regime preserved for earlier periods (pp2–3). Para 5 is the largest block: Service Line cum Development charges payable by developers and by applicants, separately in electrified and un-electrified areas, with a normative LT schedule and an instalment option (pp3–8). Para 6 sets the space a developer or applicant must make available for grid substations, switchgear, metering cubicles and distribution transformers, keyed to load and built-up-area thresholds (pp8–10). Para 7 lists the miscellaneous charges — registration, inspection, temporary supply, shifting, meter testing, duplicate bills, dishonoured cheques — cross-referenced to the Regulations (pp10–11).

Paras 8–14 are procedural: notice and rescheduling for consumer-requested meter testing (p11); mandated bill particulars (pp11–12); authorisation of officers for disconnection under s.135(1A) (p12); the manner of preparing theft/unauthorised-use inspection reports (p13); the appeal route and fee before the Appellate Authority under s.127 (p13); publication of 15-day outage schedules and SMS notice (p14); and the Standards-of-Performance reporting formats (p14). The annexures supply the actual forms, the bill layout, the appeal memorandum and the sixteen periodic reporting formats (pp15–58).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Connection and miscellaneous charges, Standards of performance, Conditions of supply

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗