Skip to content

DERC · Delhi Electricity Regulatory Commission

New Connection Application Form

Format of application form – New Connection

OrderDate not stated

Made under the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This document is the prescribed format for a new electricity connection application, headed 'Format of application form – New Connection' (p1). Pages 1–2 are the applicant-facing form: licensee and application number, applicant and premises identification including Unique Property Identification Code and landmarks, photograph, category of electricity usage, purpose of supply, total load and contract demand in kW/kVA, PAN, meter purchase option, list of attached documents and declaration form (pp1–2).

Pages 3–6 contain the declaration and undertakings signed by the applicant. It is drafted for a sole proprietorship, partnership firm, company or authorized representative, and records lawful occupancy and the request for a service connection (p3). It authorizes disconnection and adjustment of dues against consumer security deposit if statements are false, and includes undertakings on co-owner NOC, indemnity, compliance with the CEA safety regulations, internal wiring test certificate, building bye-laws/fire clearance and lift fitness certificate (p3).

Page 4 sets out category-specific supporting documents for industrial, agricultural, non-domestic khokha/temporary-structure and EV charging station applicants. It also permits an industrial connection on certain documents subject to later production of the alternative valid document within a stated compliance period (p4). Later undertakings cover document inspection, hazardous/noxious trade declarations, indemnity for wiring incidents, payment of tariff and miscellaneous charges, additional security deposit and SLD charges, compliance with the Electricity Act 2003 and Commission orders/regulations, meter access, and disconnection rights (p5). Clause 20 turns the declaration into an agreement, with witness signature on p6.

It refers to the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017 for the meter-space obligation (p5).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
New connections and load changes, Connection and miscellaneous charges, Conditions of supply

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document