Delhi Supply Code and Performance Standards (Removal of Difficulty) First Order, 2017

Delhi Supply Code and Performance Standards (Removal of Difficulty) First Order, 2017.

OrderDated 27 Sep 2017In force from 1 Sep 2017F.17(174)/Engg./DERC/17-18/5856 dated 27.09.2017

Made under the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This two-page order of the Delhi Electricity Regulatory Commission uses the "removal of difficulty" power in Regulation 85 of the DERC (Supply Code and Performance Standards) Regulations, 2017 to resolve a practical problem: how Delhi government subsidy — which is given on the basis of monthly consumption — is computed and credited where supply is through pre-payment meters (p1). The Commission records that Regulation 38(10) of the 2017 Regulations already requires a monthly statement to prepaid consumers, but that difficulty was reported in computing and giving credit of subsidy to eligible consumers on prepaid supply (p1).

Clause 1 gives the short title and makes the order applicable with effect from 1 September 2017 (p1), i.e. before the order date of 27 September 2017. Clause 2 places three timelines on the distribution licensee: prepare a monthly consumption statement within 15 days of month-end; credit any subsidy due directly to the consumer's account towards recharge within 30 days of the month for which subsidy was due; and, where supply is disconnected at the consumer's own request, refund any subsidy due by demand draft or ECS within 15 days of disconnection (p2).

The order is addressed to Delhi distribution licensees and benefits eligible subsidised consumers on prepaid meters. It fixes no subsidy amounts or eligibility criteria — those come from the Government of NCT of Delhi's separate subsidy orders, which this order only implements operationally (p1).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Subsidy and cross-subsidy, Metering, Billing and payment

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document