Skip to content

DERC · Delhi Electricity Regulatory Commission

First Relaxation Order, 2017 — Supply Code and Performance Standards Regulations, 2017 (prepaid meters)

First Relaxation Order, 2017

OrderDated 10 Oct 2017F.17(174)/Engg./DERC/17-18/5851 dated 10.10.2017

Made under the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

DERC's First Relaxation Order, 2017 (p1) is a one-page instrument that temporarily suspends the pre-payment-meter mandate in the Commission's 2017 Supply Code and Performance Standards Regulations. Regulations 11(4)(vi)(a) and 16(13) require that connections up to 45 kW, both for tenants and for applicants for temporary connection, be released only through pre-payment meters (p1). The requirement is new, and the distribution licensees said they lack enough meters and need more time for procurement, so the Commission uses Regulation 85 to keep those provisions in abeyance until 31.12.2017 and allows connections to be released through post-payment meters until then (p1). Clause 1 gives the short title and provides for commencement on the date of issue, 10.10.2017 (p1). The order does not restate or replace any other part of the 2017 Regulations.

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Metering, New connections and load changes

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document