Skip to content

DERC · Delhi Electricity Regulatory Commission

Supply Code and Performance Standards Regulations, 2017 — Statement of Objects and Reasons

SOR on DERC (Supply Code and Performance Standards) Regulations, 2017

Statement of reasonsDate not stated

The commission's reasons for the Delhi Supply Code and Performance Standards Regulations, 2017 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software, from pages 1 to 27 of 28. Check the regulator's original before you rely on it.

This Statement of Objects and Reasons (SoR) accompanies DERC's 2017 draft Supply Code and Performance Standards Regulations. It is not the regulation text; it records the statutory basis, the public consultation and the Commission's reasoning and decisions, with cross-references to final regulation numbers (p1–2). The Introduction sets out ss.46, 50 and 57 read with s.181 of the Electricity Act, 2003 and says the draft would repeal the 2007 Supply Code Regulations and the 2005 Appeal Regulations (p1). Consultation details are on p1: the draft was posted on 3.1.2017, comments were due by 20.02.2017 and extended to 21.3.2017, and public notices appeared in seven newspapers on 10.01.2017 and 16.02.2017. Section 2 says all responses were considered, though not every one is individually elaborated (p2).

Sections 3–37 then take each issue: stakeholder submissions followed by the Commission's views and decisions. They cover the definition of applicant, new connections (multi-storey, reconstruction, release timelines, un-electrified areas, tenants, agriculture, single-point conversion), reclassification, charges, security deposit and bank guarantee, land, meter testing, billing period and bill delivery, prepaid rebate and advance payment, inspection and videography, theft and unauthorized use, assessment formula, appeal deposits, call centres and restoration messages, and performance-standards compensation (pp2–27). Several matters are expressly left to separate Orders, including charges, security deposit amounts, land dimensions and prepaid rebate values (pp8, 13–16, 18). The compensation discussion rejects automatic compensation and routes claims through the licensee, Forum or Ombudsman, with above-20kW consumers approaching the Commission (pp24–27). It refers to Schedule-I for guaranteed standards and compensation and to Appendix-I for the season-based assessment formula, but does not reproduce them (pp20, 25–27).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Conditions of supply, Standards of performance, New connections and load changes

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document