Skip to content

DERC · Delhi Electricity Regulatory Commission

Delhi Electricity Supply Code and Performance Standards (Relaxation) Third Order, 2020

OrderDated 4 May 2020In force from 24 Mar 2020F.17 (266)/DERC/Engg./2018-19/6330/ dated 04.05.2020

Made under the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-page DERC relaxation order issued on 4 May 2020, the third in a series relaxing the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017 for the Covid-19 period (p1–2). It responds to complaints from industrial and non-domestic tariff consumers that provisional bills raised under Regulation 30(10) on the basis of the corresponding period of the previous year were far higher than their actual consumption, which had fallen to almost nil after units were closed (p1).

The operative part (p2) confines provisional billing for these two categories to cases where the licensee genuinely could not read or record the meter; otherwise the bill must be based on actual recorded consumption. Where a provisional bill is unavoidable, it may cover fixed charges and associated applicable charges only, treating energy consumption as nil, and any bill already raised on the old basis since 24.03.2020 must be revised accordingly. Self-reported readings with a meter photograph remain usable, subject to adjustment when the meter is actually read. All other terms of the 7 April 2020 Covid order are left unchanged.

The order is expressly concurrent with that 7 April 2020 order and so takes effect from 24 March 2020 (p2), making its relief retrospective to the start of the period the earlier order covered.

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Billing and payment, Conditions of supply

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document