Skip to content

DERC · Delhi Electricity Regulatory Commission

Supply Code and Performance Standards (Sixth Amendment) Regulations 2024 — Draft

Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) (Sixth Amendment) Regulations 2024

Draft amendmentDated 5 Jul 2024

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page draft regulation from the Delhi Electricity Regulatory Commission that would make three changes to the DERC (Supply Code and Performance Standards) Regulations, 2017 (p1). It is drafted for publication in the Delhi Gazette Extraordinary and takes effect from the date of that publication; neither the notification number nor any date is filled in (p1).

Clause 1 gives the short title — Sixth Amendment Regulations 2024 — and the commencement rule (p1). Clause 2 inserts two new sub-regulations into Regulation 10 of the Principal Regulations. New Regulation 10(7) lets the Distribution Licensee disconnect supply where a court, the DDA, the MCD or another competent statutory authority has ordered demolition of the premises. New Regulation 10(8) makes a Fire Clearance Certificate from the competent authority a precondition for releasing an electricity connection to a dwelling unit above stated heights — the text sets the threshold at "the height of 15 meters without stilt parking" or "the height of 17.5 meters with stilt parking" — and requires the certificate to be produced before the licensee on demand (p1). Clause 3 simply deletes Regulation 50(7) of the Principal Regulations, without saying what it provided (p1).

The document is signed by the Secretary, DERC (p1). It contains no schedules, forms, fees, savings or transitional provisions.

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
New connections and load changes, Conditions of supply, Supply to buildings and colonies

Read with this

Procedures and orders made under it

Proposed changes (drafts with no final yet)

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document