Skip to content

DERC · Delhi Electricity Regulatory Commission

Schedule of Charges and Procedure under Supply Code and Performance Standards Regulations, 2017 — Statement of Reasons

Statement of Objects and Reasons on Schedule of Charges and Procedure under Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017

Statement of reasonsDated 31 Jul 2017

The commission's reasons for the Delhi Supply Code and Performance Standards Regulations, 2017 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is DERC's Statement of Objects and Reasons for the order prescribing the schedule of charges and procedure under the DERC (Supply Code and Performance Standards) Regulations, 2017. It is not the operative order itself; it explains the draft order, stakeholder comments, and the Commission's final decisions clause by clause (pp1–16). The introduction says the Commission used Regulation 84 of the 2017 Supply Code Regulations to issue the charges/procedure order, placed a draft on 7.7.2017, sought comments by 31.07.2017, and published notices in seven newspapers on 14.07.2017 (p1). Chapter 2 records that comments from stakeholders including the GNCTD Power Department were considered (p1). Chapters 3–12 each address a draft clause: classification of supply and LT voltage (pp1–2); whether security deposit is based on sanctioned load or contract demand (pp2–3); review of security deposit amounts, including pre-paid meter treatment (pp3–5); interest on security deposit (pp5–6); service line cum development charges and supervision charges (pp6–9); space for grid substations/transformers (pp10–12); review of miscellaneous charges (pp12–14); meter testing notice procedure (pp14–15); outage-duration statement in bills (p15); and fees for appeals under s.127 (pp15–16). For each, it sets out stakeholder submissions, the Commission's views, and the final decision, often referring to the corresponding final Order clause. The SoR includes tables of indicative costs, security deposit rates, connection charges, SLD charges and appeal fee, but the operative rates are to be read in the final Order. It ends with the Secretary's signature (p16).

Standard name
Electricity Supply Code
Primary topics
Connection and miscellaneous charges, Security deposit, Metering

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document