Skip to content

DERC · Delhi Electricity Regulatory Commission

Draft Schedule of Charges and Procedure under Supply Code and Performance Standards Regulations, 2017

Schedule of Charges and the procedure under Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017.

Draft orderDated 7 Jul 2017

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Delhi Electricity Regulatory Commission issues this draft order under Regulation 84 of the DERC (Supply Code and Performance Standards) Regulations, 2017 to fix the schedule of charges and the working procedures needed to operate those Regulations (p1). Clause 1 sets the voltage at which connections are released according to contract demand or sanctioned load, from single-phase LT to EHT, with provisos continuing existing connections given at other voltages, allowing 5-10 kW loads to be released at three-phase 400 V, and letting developers take LT supply for members even where aggregate demand is HT/EHT (p1-2). Clause 2 maps the application forms (Annexures I-IX) to the Regulations. Clause 3 prescribes security deposits by tariff category; clause 4 interest on security deposit at SBI's MCLR as on 1 April each year, with the period before this order left to the 2007 Supply Code Regulations; and clause 5 the Service Line cum Development charges payable by developers and by applicants at EHT, HT and LT, including normative LT charges for connections and load enhancements in areas declared un-electrified on 31.7.2017 (p2-7).

Clause 6 requires developers and applicants to provide land and space for grid substations, distribution transformers, switchgear, metering cubicles and service lines, sets the thresholds that trigger the obligation, has the GNCTD Power Department appoint a nodal officer within thirty days, and lets the licensee refuse additional load where space is not provided (p7-9). Clause 7 lists the miscellaneous charges - registration and processing, field and installation inspection, pre-payment security, temporary supply, shifting, special meter reading, reconnection, meter testing and duplicate bills - each tied to its regulation (p9-10).

Clauses 8 to 13 cover consumer-facing procedure: the particulars a bill must carry and the Annexure X bill format; the officers authorised to disconnect for unauthorised use under s.135(1A); how site inspection reports under Regulations 57(1) and 61(1) are prepared; the appeal procedure and fee before the Appellate Authority under s.127; the schedule for publishing planned outages on the licensee's website, notice boards and by SMS; and the Standards of Performance reporting formats (p10-13). Clause 14 makes the order applicable from the date the 2017 Regulations apply and keeps it in force till revised (p13). The annexures supply the application forms, the bill and appeal formats, and Formats I-XVI for periodic reporting (p14-54).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Connection and miscellaneous charges, Security deposit, Conditions of supply

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document