DERC · Delhi Electricity Regulatory Commission

Schedule of Charges and the Procedure (Sixth Amendment) Order, 2021

OrderDated 15 Apr 2021F.17(85)/Engg./DERC/2020-21/6908 dated 15.04.2021

Made under the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Delhi Electricity Regulatory Commission's sixth amendment to its Order of 31 August 2017 (the "Principal Order"), issued on 15 April 2021 under Regulations 84 and 87 of the DERC (Supply Code and Performance Standards) Regulations, 2017. It is a short two-page instrument that changes what a distribution licensee in Delhi may demand from an applicant for a new electricity connection in a residential building.

Section 2 inserts two new sub-clauses at the end of Clause 2 of the Principal Order, keyed to building height and to whether the building has stilt parking: below the stated heights the licensee must not insist on a Fire Clearance Certificate, and above them it must release connections for the dwelling units below the thresholds while refusing connections to units above them unless a fire clearance certificate has been obtained (p1). A proviso preserves the licensee's ability to act against unauthorized connections under sections 126, 135 and 138 of the Electricity Act, 2003 and to disconnect, immediately, the consumer who supplied electricity unauthorisedly (p1).

Section 3 amends Annexure-I, the new-connection application format: entry 3(b) is substituted, clause 5 of the Declaration is replaced with a self-declaration that the building follows prevailing building bye-laws and that any required fire clearance certificate is available with the applicant, and clause 7B(ii) is deleted, leaving agricultural consumers with a Block Development Officer's residence certificate (p2). The modified Annexure-I is stated to be enclosed with the order (p2).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Conditions of supply, Agricultural supply

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document