DERC · Delhi Electricity Regulatory Commission
Schedule of Charges and the Procedure Order, 2017 — Fourth Amendment, 2019
Schedule of Charges and the Procedure (Fourth Amendment) Order, 2019
OrderDated 23 Oct 2019F.17 (230)/Engg./DERC/2018-19/6420 dated 23.10.2019
Made under the Delhi Supply Code and Performance Standards Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Delhi Electricity Regulatory Commission's Fourth Amendment to its Schedule of Charges and the Procedure Order, 2017. Issued as F.17 (230)/Engg./DERC/2018-19/6420 and dated 23.10.2019, it is made under Regulation 84 of the DERC (Supply Code and Performance Standards) Regulations, 2017, and takes effect from the date of issue rather than from a tariff or control period (p1).
The operative change is a straight substitution of Clause 5(3) of the Principal Order — the clause that governs what an applicant pays for a new low-tension connection. The new sub-clause (3) covers connections at LT level up to 200kW/215kVA, cross-referring to Regulation 21(2) of the Supply Code Regulations, and frames the amounts as normative SLD charges (p1). A tabular schedule differentiates the charge by type of area and by sanctioned-load band, with road restoration charges for the service line recovered separately at actuals on top of the normative amount (p1). The visible bands on p1 are the electrified-area slabs up to 5 kW and above 5 kW up to 150 kW, the latter built as a base amount plus a per-kW/kVA increment subject to a maximum.
The schedule continues onto p2, where the remaining bands — higher sanctioned loads, un-electrified areas and agriculture — are listed. Two riders survive: the un-electrified-area charges apply to areas the Licensee declared un-electrified as on 31.7.2017 and run only till further Orders of the Commission; and an applicant taking up to 10 kW in an un-electrified area may pay the SLD charges in twelve equal monthly instalments (p1). The substituted clause also covers load enhancement, not only new connections (p1).
Read with this
The regulation
- Dated 7 Jul 2017Delhi Supply Code and Performance Standards Regulations, 2017
Amendments and corrections
- Dated 2 Feb 2018Supply Code and Performance Standards (First Amendment) Regulations, 2018
- Dated 7 Mar 2018Supply Code and Performance Standards (First Amendment) Regulations, 2018 — Corrigendum
- Dated 25 Sep 2018Supply Code and Performance Standards Regulations, 2017 — Second Amendment, 2018
- Dated 18 Dec 2018Supply Code and Performance Standards (Third Amendment) Regulations, 2018
- Dated 24 May 2019Supply Code and Performance Standards, 2017 — Fourth Amendment, 2019
- Dated 16 Jul 2024Supply Code and Performance Standards Regulations, 2017 — Fifth Amendment, 2024
- Dated 2 Jun 2025Supply Code and Performance Standards Regulations, 2017 — Seventh Amendment, 2025
- Dated 25 Jun 2025Supply Code and Performance Standards Seventh Amendment Regulations, 2025 — Corrigendum
Commencement notices and reasons
- Dated 31 Jul 2017Schedule of Charges and Procedure under Supply Code and Performance Standards Regulations, 2017 — Statement of Reasons
- Date not statedSupply Code and Performance Standards Regulations, 2017 — Statement of Objects and Reasons
- Date not statedSchedule of Charges and the Procedure (Sixth Amendment) Order, 2021 — Explanatory Note
Procedures and orders made under it
- Dated 31 Aug 2017Schedule of Charges and Procedure under the Supply Code and Performance Standards Regulations, 2017 — Order
- Dated 27 Sep 2017Delhi Supply Code and Performance Standards (Removal of Difficulty) First Order, 2017
- Dated 28 Sep 2017Schedule of Charges and the Procedure (First Amendment) Order, 2017
- Dated 10 Oct 2017First Relaxation Order, 2017 — Supply Code and Performance Standards Regulations, 2017 (prepaid meters)
- Dated 2 Feb 2018Schedule of Charges and the Procedure Order, 2017 — Second Amendment, 2018
- Dated 6 Feb 2018Delhi Electricity Supply Code and Performance Standards (Removal of Difficulty) Second Order, 2018
- Dated 26 Jun 2018Clarification on levy of temporary surcharge for unauthorised use of electricity, 2018
- Dated 4 Jul 2018Schedule of Charges and the Procedure (Third Amendment) Order, 2018
- Dated 5 Sep 2018Notification of Laboratory for Testing of Tampered Meters under Supply Code and Performance Standards Regulations, 2017 — Order, 2018
- Dated 24 Sep 2018Delhi Electricity Supply Code and Performance Standards (Removal of Difficulty) Third Order, 2018
- Dated 27 Feb 2019Manual of Practices for Handling Consumers' Complaints, 2019
- Dated 16 Apr 2019Manual of practice for handling consumer complaints — review of customer care centre timings
- Dated 31 May 2019Delhi Electricity Supply Code and Performance Standards (Relaxation) Second Order, 2019
- Dated 30 Dec 2019Schedule of Charges and the Procedure (Fifth Amendment) Order, 2019
- Dated 4 May 2020Delhi Electricity Supply Code and Performance Standards (Relaxation) Third Order, 2020
- Dated 25 Aug 2020Refund of Security Deposit and Other Credits on Termination of Connection — Clarification, 2020
- Dated 15 Apr 2021Schedule of Charges and the Procedure (Sixth Amendment) Order, 2021
- Dated 27 Apr 2021Suspension of Standards of Performance Order, 2021
- Dated 22 Jun 2021Revocation of Order dated 27.04.2021
- Dated 3 Feb 2022Order in the matter of Order dtd. 10/01/2022
- Dated 1 Jul 2026Delhi Electricity Supply Code and Performance Standards — Fourth Removal of Difficulty Order, 2026
- Date not statedNew Connection Application Form
Proposed changes (drafts with no final yet)
- Dated 5 Jul 2024Supply Code and Performance Standards (Sixth Amendment) Regulations 2024 — Draft
- Dated 2 Jul 2024Public notice: Public Notice — Draft Supply Code and Performance Standards (Sixth Amendment) Regulations, 2024
Earlier drafts
- Dated 20 Feb 2017Delhi Supply Code and Performance Standards Regulations, 2017 — Draft
- Dated 7 Jul 2017Draft Schedule of Charges and Procedure under Supply Code and Performance Standards Regulations, 2017
- Dated 1 Jan 2018Schedule of Charges and the Procedure (Third Amendment) Order, 2018 — Draft
- Dated 1 Jan 2018Public notice: Draft Schedule of Charges and the Procedure (Third Amendment) Order, 2018 — Public Notice
- Dated 4 Jul 2018Supply Code and Performance Standards Regulations, 2017 — Second Amendment, 2018 — Draft
- Dated 4 Jul 2018Public notice: Supply Code and Performance Standards, 2017 — Second Amendment, 2018 — Public Notice — Draft
- Dated 28 Feb 2019Supply Code and Performance Standards (Fourth Amendment) Regulations, 2019
- Dated 7 Jun 2024Supply Code and Performance Standards, 2017 — Fifth Amendment, 2024 — Draft
- Dated 7 Jun 2024Public notice: Supply Code and Performance Standards Regulations, 2017 — Fifth Amendment, 2024 — Public Notice on Draft
- Dated 1 May 2025Supply Code and Performance Standards Regulations, 2017 — Seventh Amendment, 2025 — Draft
- Dated 1 May 2025Public notice: Supply Code and Performance Standards Regulations, 2017 — Seventh Amendment, 2025 — Public Notice — Draft
3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.