Skip to content

DERC · Delhi Electricity Regulatory Commission

Schedule of Charges and the Procedure Order, 2017 — Fourth Amendment, 2019

Schedule of Charges and the Procedure (Fourth Amendment) Order, 2019

OrderDated 23 Oct 2019F.17 (230)/Engg./DERC/2018-19/6420 dated 23.10.2019

Made under the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Delhi Electricity Regulatory Commission's Fourth Amendment to its Schedule of Charges and the Procedure Order, 2017. Issued as F.17 (230)/Engg./DERC/2018-19/6420 and dated 23.10.2019, it is made under Regulation 84 of the DERC (Supply Code and Performance Standards) Regulations, 2017, and takes effect from the date of issue rather than from a tariff or control period (p1).

The operative change is a straight substitution of Clause 5(3) of the Principal Order — the clause that governs what an applicant pays for a new low-tension connection. The new sub-clause (3) covers connections at LT level up to 200kW/215kVA, cross-referring to Regulation 21(2) of the Supply Code Regulations, and frames the amounts as normative SLD charges (p1). A tabular schedule differentiates the charge by type of area and by sanctioned-load band, with road restoration charges for the service line recovered separately at actuals on top of the normative amount (p1). The visible bands on p1 are the electrified-area slabs up to 5 kW and above 5 kW up to 150 kW, the latter built as a base amount plus a per-kW/kVA increment subject to a maximum.

The schedule continues onto p2, where the remaining bands — higher sanctioned loads, un-electrified areas and agriculture — are listed. Two riders survive: the un-electrified-area charges apply to areas the Licensee declared un-electrified as on 31.7.2017 and run only till further Orders of the Commission; and an applicant taking up to 10 kW in an un-electrified area may pay the SLD charges in twelve equal monthly instalments (p1). The substituted clause also covers load enhancement, not only new connections (p1).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document