Skip to content

DERC · Delhi Electricity Regulatory Commission

Schedule of Charges and the Procedure (Sixth Amendment) Order, 2021 — Explanatory Note

Explanatory Note on Schedule of Charges and the Procedure (Sixth Amendment) Order, 2021.

OrderDate not stated

Read with the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is an explanatory note issued by the Delhi Electricity Regulatory Commission that accompanies the Sixth Amendment (2021) to the DERC "Schedule of Charges and the Procedure" Order — the Order dated 31.08.2017 that governs new-connection applications and connection procedure for Delhi's distribution licensees (p1). It is written part by part: for each issue the Commission sets out the background, its reasoning, and then the amended text in italics.

Part 1 (p1) deals with the Unique Property Identification Code (UPIC). Acting on a letter from the South Delhi Municipal Corporation, the Commission adds a UPIC column to entry 3(b) of the new-connection application form (Annexure-I) and requires applicants to obtain the UPIC from the Municipal Corporation of Delhi before applying — but directs that the application be processed without a UPIC where the applicant has applied and the code has not been issued, or where the corporation does not issue it at all.

Part 2 (p2–3) resolves the fire-clearance problem for high-rise residential buildings. Reaffirming its 31.05.2019 clarification and following a meeting with the Delhi Fire Services, the Commission inserts new sub-clauses (3) and (4) into clause 2 of the 31.08.2017 Order. These distinguish between dwelling units within specified building heights (no Fire Clearance Certificate to be insisted on) and units above those heights (no connection without a fire clearance certificate), and they direct the licensee to act against unauthorized connections under sections 126/135/138 of the Electricity Act 2003 and to inspect such premises periodically. Clause 5 of the Declaration in Annexure-I is substituted accordingly.

Part 3 (p4) deletes the requirement of a No Objection Certificate from the Delhi Jal Board for tube wells at para 7B(ii) of Annexure-I, relying on the Ministry of Jal Shakti's groundwater-extraction guidelines exempting agricultural activities.

The note does not state a date of coming into force.

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
New connections and load changes, Supply to buildings and colonies, Agricultural supply

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document