DERC · Delhi Electricity Regulatory Commission
Supply Code and Performance Standards Regulations, 2017 — Second Amendment, 2018
Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) (Second Amendment) Regulations, 2018
AmendmentDated 25 Sep 2018No. F.17(85)/DERC/Engg./2017-18/5855
Amends the Delhi Supply Code and Performance Standards Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the second amendment to DERC's 2017 Supply Code and Performance Standards Regulations, notified by the Commission and to be published in the Delhi Gazette Extraordinary (p1). It states that it was made after previous publication and pursuant to directions from the Government of NCT of Delhi under s.108 of the Electricity Act 2003, with the stated aim of bringing clarity and ease of implementation (p1). It comes into effect on gazette publication, though the gazette date is not printed (p1).
Section 1 sets the title and commencement (p1). Section 2 amends Regulation 20 on security deposits: it substitutes the threshold figure in the second proviso of sub-Regulation (1), changing '1MVA' to '100kW' (p1), and replaces sub-Regulations (7) and (8) so that on transfer of a connection the deposit held in the preceding consumer's name moves to the applicant with no additional deposit, while on upward revision of sanctioned load or contract demand the consumer pays an additional deposit at rates prevailing on the date of enhancement. It adds an explanation of how 'additional load' is computed and a note on adjusting, in ensuing bills, enhanced deposits taken on a total-load basis after 1.9.2017 (p1–2).
Section 3 replaces the second proviso and explanation to Regulation 21(2), specifying when differential Service Line cum Development Charges become payable when a service line is actually changed on load enhancement, and how the additional load is measured (p2). Section 4 substitutes Regulation 22(1), obliging developers and applicants to provide free land space of dimensions notified in the Commission's Orders for grid substations, transformers, switchgear and meters, with provisos for government-agency developers and for cases where no developer exists — there the licensee must approach the GNCTD within fifteen days for allotment (p2–3). Section 5 amends Regulation 29: a new proviso gives consumers the option to have a smart meter installed inside their premises, and sub-Regulation (4) is replaced to say meters in multi-storey buildings should preferably be on a ventilated, well-lit part of the ground floor (p3).
The closing Note records when the Principal Regulations and First Amendment were gazetted (p3).
Read with this
The regulation
- Dated 7 Jul 2017Delhi Supply Code and Performance Standards Regulations, 2017
Amendments and corrections
- Dated 2 Feb 2018Supply Code and Performance Standards (First Amendment) Regulations, 2018
- Dated 7 Mar 2018Supply Code and Performance Standards (First Amendment) Regulations, 2018 — Corrigendum
- Dated 18 Dec 2018Supply Code and Performance Standards (Third Amendment) Regulations, 2018
- Dated 24 May 2019Supply Code and Performance Standards, 2017 — Fourth Amendment, 2019
- Dated 16 Jul 2024Supply Code and Performance Standards Regulations, 2017 — Fifth Amendment, 2024
- Dated 2 Jun 2025Supply Code and Performance Standards Regulations, 2017 — Seventh Amendment, 2025
- Dated 25 Jun 2025Supply Code and Performance Standards Seventh Amendment Regulations, 2025 — Corrigendum
Commencement notices and reasons
- Dated 31 Jul 2017Schedule of Charges and Procedure under Supply Code and Performance Standards Regulations, 2017 — Statement of Reasons
- Date not statedSupply Code and Performance Standards Regulations, 2017 — Statement of Objects and Reasons
- Date not statedSchedule of Charges and the Procedure (Sixth Amendment) Order, 2021 — Explanatory Note
Procedures and orders made under it
- Dated 31 Aug 2017Schedule of Charges and Procedure under the Supply Code and Performance Standards Regulations, 2017 — Order
- Dated 27 Sep 2017Delhi Supply Code and Performance Standards (Removal of Difficulty) First Order, 2017
- Dated 28 Sep 2017Schedule of Charges and the Procedure (First Amendment) Order, 2017
- Dated 10 Oct 2017First Relaxation Order, 2017 — Supply Code and Performance Standards Regulations, 2017 (prepaid meters)
- Dated 2 Feb 2018Schedule of Charges and the Procedure Order, 2017 — Second Amendment, 2018
- Dated 6 Feb 2018Delhi Electricity Supply Code and Performance Standards (Removal of Difficulty) Second Order, 2018
- Dated 26 Jun 2018Clarification on levy of temporary surcharge for unauthorised use of electricity, 2018
- Dated 4 Jul 2018Schedule of Charges and the Procedure (Third Amendment) Order, 2018
- Dated 5 Sep 2018Notification of Laboratory for Testing of Tampered Meters under Supply Code and Performance Standards Regulations, 2017 — Order, 2018
- Dated 24 Sep 2018Delhi Electricity Supply Code and Performance Standards (Removal of Difficulty) Third Order, 2018
- Dated 27 Feb 2019Manual of Practices for Handling Consumers' Complaints, 2019
- Dated 16 Apr 2019Manual of practice for handling consumer complaints — review of customer care centre timings
- Dated 31 May 2019Delhi Electricity Supply Code and Performance Standards (Relaxation) Second Order, 2019
- Dated 23 Oct 2019Schedule of Charges and the Procedure Order, 2017 — Fourth Amendment, 2019
- Dated 30 Dec 2019Schedule of Charges and the Procedure (Fifth Amendment) Order, 2019
- Dated 4 May 2020Delhi Electricity Supply Code and Performance Standards (Relaxation) Third Order, 2020
- Dated 25 Aug 2020Refund of Security Deposit and Other Credits on Termination of Connection — Clarification, 2020
- Dated 15 Apr 2021Schedule of Charges and the Procedure (Sixth Amendment) Order, 2021
- Dated 27 Apr 2021Suspension of Standards of Performance Order, 2021
- Dated 22 Jun 2021Revocation of Order dated 27.04.2021
- Dated 3 Feb 2022Order in the matter of Order dtd. 10/01/2022
- Dated 1 Jul 2026Delhi Electricity Supply Code and Performance Standards — Fourth Removal of Difficulty Order, 2026
- Date not statedNew Connection Application Form
Proposed changes (drafts with no final yet)
- Dated 5 Jul 2024Supply Code and Performance Standards (Sixth Amendment) Regulations 2024 — Draft
- Dated 2 Jul 2024Public notice: Public Notice — Draft Supply Code and Performance Standards (Sixth Amendment) Regulations, 2024
Earlier drafts
- Dated 20 Feb 2017Delhi Supply Code and Performance Standards Regulations, 2017 — Draft
- Dated 7 Jul 2017Draft Schedule of Charges and Procedure under Supply Code and Performance Standards Regulations, 2017
- Dated 1 Jan 2018Schedule of Charges and the Procedure (Third Amendment) Order, 2018 — Draft
- Dated 1 Jan 2018Public notice: Draft Schedule of Charges and the Procedure (Third Amendment) Order, 2018 — Public Notice
- Dated 4 Jul 2018Supply Code and Performance Standards Regulations, 2017 — Second Amendment, 2018 — Draft
- Dated 4 Jul 2018Public notice: Supply Code and Performance Standards, 2017 — Second Amendment, 2018 — Public Notice — Draft
- Dated 28 Feb 2019Supply Code and Performance Standards (Fourth Amendment) Regulations, 2019
- Dated 7 Jun 2024Supply Code and Performance Standards, 2017 — Fifth Amendment, 2024 — Draft
- Dated 7 Jun 2024Public notice: Supply Code and Performance Standards Regulations, 2017 — Fifth Amendment, 2024 — Public Notice on Draft
- Dated 1 May 2025Supply Code and Performance Standards Regulations, 2017 — Seventh Amendment, 2025 — Draft
- Dated 1 May 2025Public notice: Supply Code and Performance Standards Regulations, 2017 — Seventh Amendment, 2025 — Public Notice — Draft
3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.