Supply Code and Performance Standards Regulations, 2017 — Second Amendment, 2018

Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) (Second Amendment) Regulations, 2018

AmendmentDated 25 Sep 2018No. F.17(85)/DERC/Engg./2017-18/5855

Amends the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the second amendment to DERC's 2017 Supply Code and Performance Standards Regulations, notified by the Commission and to be published in the Delhi Gazette Extraordinary (p1). It states that it was made after previous publication and pursuant to directions from the Government of NCT of Delhi under s.108 of the Electricity Act 2003, with the stated aim of bringing clarity and ease of implementation (p1). It comes into effect on gazette publication, though the gazette date is not printed (p1).

Section 1 sets the title and commencement (p1). Section 2 amends Regulation 20 on security deposits: it substitutes the threshold figure in the second proviso of sub-Regulation (1), changing '1MVA' to '100kW' (p1), and replaces sub-Regulations (7) and (8) so that on transfer of a connection the deposit held in the preceding consumer's name moves to the applicant with no additional deposit, while on upward revision of sanctioned load or contract demand the consumer pays an additional deposit at rates prevailing on the date of enhancement. It adds an explanation of how 'additional load' is computed and a note on adjusting, in ensuing bills, enhanced deposits taken on a total-load basis after 1.9.2017 (p1–2).

Section 3 replaces the second proviso and explanation to Regulation 21(2), specifying when differential Service Line cum Development Charges become payable when a service line is actually changed on load enhancement, and how the additional load is measured (p2). Section 4 substitutes Regulation 22(1), obliging developers and applicants to provide free land space of dimensions notified in the Commission's Orders for grid substations, transformers, switchgear and meters, with provisos for government-agency developers and for cases where no developer exists — there the licensee must approach the GNCTD within fifteen days for allotment (p2–3). Section 5 amends Regulation 29: a new proviso gives consumers the option to have a smart meter installed inside their premises, and sub-Regulation (4) is replaced to say meters in multi-storey buildings should preferably be on a ventilated, well-lit part of the ground floor (p3).

The closing Note records when the Principal Regulations and First Amendment were gazetted (p3).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Conditions of supply, Security deposit, Connection and miscellaneous charges

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document