Skip to content

DERC · Delhi Electricity Regulatory Commission

Schedule of Charges and the Procedure (First Amendment) Order, 2017

OrderDated 28 Sep 2017F.17(85)/Engg./DERC/2017-18/5767 dated 28.09.2017

Made under the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Delhi Electricity Regulatory Commission amends its own Order of 31 August 2017 — called here "the Principal Order" — which set out the Schedule of Charges and the Procedure for distribution connections. This first amendment was issued on 28 September 2017 and takes effect from that date (p1).

Paragraph 2.0(1) replaces the security deposit table in Clause 3(1) of the Principal Order with a fresh table fixing deposits per kW or kVA for each tariff category. It splits domestic consumers into three connected-load slabs and carries separate rows for non-domestic, industrial, agriculture, public lighting, railway/DMRC/DIAL/DJB, mushroom cultivation, advertisement and hoardings, and E-rickshaw/E-vehicle charging stations (p1). Two of those rows — advertisement and hoardings, and charging stations — are left blank in the substituted table (p1).

Paragraph 2.0(2) inserts a new sub-clause (1)A giving the Commission discretion to decide the security deposit for any category not listed in the table (p2). The order is signed by a single Member (p2).

Standard name
Electricity Supply Code
Primary topics
Security deposit

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document