Skip to content

DERC · Delhi Electricity Regulatory Commission

Supply Code and Performance Standards Regulations, 2017 — Fifth Amendment, 2024

Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) (Fifth Amendment) Regulations, 2024

AmendmentDated 16 Jul 2024F.17(85)/DERC/Engg./2020-21/7022 dated 16.07.2024

Amends the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fifth Amendment to the DERC (Supply Code and Performance Standards) Regulations, 2017, issued by the Delhi Electricity Regulatory Commission and dated 16 July 2024 (p1). It is a short amending instrument: it changes definitions in Regulation 2 and the connection-energisation timeline in Regulation 11(4)(i), and it comes into effect from publication in the official Gazette (p1).

On definitions, it substitutes “Application” so that a complete application must be in the licensee’s format with documents, charges and compliances and must be received by 1500 hrs (p1). It inserts a definition of “Metropolitan Area” keyed to an area with a population of 10 lakh or 1 million or more, comprised in one or more districts and two or more municipalities/panchayats or contiguous areas, as notified by the Lt. Governor (p1). It substitutes “Urban areas” to mean all areas other than rural areas and Metropolitan Areas (p1).

On performance standards, it amends Regulation 11(4)(i) for energisation from the existing distribution system in electrified areas (p1–2). It sets differentiated maximum timelines after application acceptance, defect rectification and payment, depending on whether the area is metropolitan, urban or rural, and whether road-cutting permission or right of way is required; the text also provides illustrative tables for total time (p2).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
New connections and load changes, Standards of performance, Conditions of supply

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.