Schedule of Charges and the Procedure (Fifth Amendment) Order, 2019

OrderDated 30 Dec 2019F.17 (266)/DERC/Engg./2018-19/6330/ dated 30.12.2019

Made under the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short DERC amendment order, dated 30.12.2019, that rewrites the connection-charge clause of the Commission's 2017 Schedule of Charges and the Procedure Order. It substitutes Clause 5(3) of the Principal Order (p1) and applies only to applicants taking a new low-tension connection at a load of up to 200 kW/215 kVA under Regulation 21(2) of the Supply Code Regulations (p1).

The substituted clause lays down a slab table of normative SLD charges. For electrified areas it sets Rs.3000 for loads up to 5 kW and Rs.3000 plus Rs.500 per kW or kVA beyond 5 kW, limited to a maximum of Rs.15,000; road restoration charges are payable at actuals for the service line (p1). The table also carries an un-electrified-area row.

The second limb is retrospective. The difference between SLD charges collected from such LT applicants from 01.09.2017 at un-electrified-area rates and the SLD estimated at electrified-area rates applicable on the date of application is to be adjusted in the applicant's ensuing electricity bill (p2). The order is signed by the Chairperson; apart from the order date, no commencement date is stated (p1–2).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document