Supply Code and Performance Standards, 2017 — Fourth Amendment, 2019

Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) (Fourth Amendment) Regulations, 2019

AmendmentDated 24 May 2019No. F.17(85)/DERC/Engg./2019-2020/6432

Amends the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-clause amending regulation issued by the Delhi Electricity Regulatory Commission. It substitutes a new sub-Regulation (1) of Regulation 17 of the DERC (Supply Code and Performance Standards) Regulations, 2017, dealing with transfer of an electricity connection between consumers (p1).

The new text sets out the grounds on which a transfer may be sought — change of consumer name on change of ownership or occupancy, transfer to a legal heir and similar cases — and requires an application to the distribution licensee in the format notified in the Commission's Orders (p1).

Much of the operative content sits in provisos. Where ownership data flows to the licensee from the Sub-Registrar's system, the transfer is to be processed without a separate request or additional documents (p1–2); where multiple owners take the property, the connection goes in the first owner's name, with others able to add their names on request (p2). Deficiency in an application is to be intimated in writing and the application accepted only after it is cured; transfer is not approved until all recoverable dues on the connection are paid, and no dues may thereafter be recovered from the new consumer (p2). The name change is to be effected within two billing cycles after acceptance or clearance of dues, whichever is later, and the new consumer otherwise remains subject to the Regulations and the connection declaration terms (p2–3). Where the change is not effected in time, the consumer may claim and the licensee must pay compensation as specified in Schedule-I of the Principal Regulations (p3).

Clause 1 gives the short title and states commencement from the date of publication in the official Gazette (p1); the Gazette date does not appear in the text. A closing Note lists the publication dates of the Principal Regulations and the First, Second and Third Amendments (p3).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Conditions of supply, New connections and load changes, Standards of performance

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document