DERC · Delhi Electricity Regulatory Commission

Supply Code and Performance Standards (First Amendment) Regulations, 2018

Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) (First Amendment) Regulations, 2018

AmendmentDated 2 Feb 2018No. F.17(85)/DERC/Engg./2017-18/5855

Amends the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the first amending instrument to DERC's Supply Code and Performance Standards Regulations, issued under Regulation 87 of the parent regulations and taking effect from the date of Gazette publication — a date the document itself does not print (p1). It is purely an amendment: every clause changes, inserts into or omits text from the 2017 Principal Regulations, so it has no standalone obligations.

The opening clauses tidy the parent text: a billing-cycle phrase is dropped from a definition in Regulation 2, and the low-tension supply voltages for single-phase and three-phase are restated in Regulation 4 (p1). Clause 4 introduces a scope threshold — consumers at 2 kW sanctioned load and above must install earth leakage protection, and no new connection at that load may be energised without one (p1). Clause 5 addresses temporary connections, adding a charge where the meter's recorded maximum demand exceeds sanctioned load and shortening an existing time limit (p2). Clause 6 routes conversion of the classification of supply to future Commission orders (p2).

Clause 7 is the substantive core, rewriting Regulation 29 on metering: installation and sealing in the consumer's presence, advance notice (at least three days for replacement), recording particulars on a Commission-approved meter particulars sheet, and delivery of a signed copy to the consumer, with digital recording and email delivery permitted and hard copies only on request (p2–4). Clause 8 makes a drafting correction and replaces the provision on testing suspected tampered or burnt meters, pointing to a Commission-notified accredited laboratory with a fallback (p3–4).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Metering, New connections and load changes, Electrical safety

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document