DERC · Delhi Electricity Regulatory Commission

Delhi Electricity Supply Code and Performance Standards (Removal of Difficulty) Second Order, 2018

OrderDated 6 Feb 2018F.17(174)/DERC/Engg./17-18/5856 dated 06.02.2018

Made under the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

DERC's Second Removal of Difficulty Order, 2018 (p1–2) is a short clarifying instrument that resolves three practical ambiguities facing Delhi's distribution licensees when releasing, charging for and extending temporary electricity connections under the DERC (Supply Code and Performance Standards) Regulations, 2017. The preamble (p1) records that the Regulations require a one-time non-refundable charge for consumables and non-retrieval of equipment, that Regulations 16(14) and 16(15) allow extension on payment if applied at least one day before expiry, and that the DERC Order dated 31.8.2017 sets separate charge rates for temporary connections at HT and LT supply.

Clause 2.1 (p2) settles whether the one-time non-refundable charge covers the service line — it does — and vests ownership of the service line with the distribution licensee. Clause 2.2 (p2) bars the licensee from demanding the one-time non-refundable charge a second time where extension is applied for before expiry, and sets the billing procedure on extension: an immediate bill for the previous period, adjustment of the security deposit, payment of any balance before extension, and carry-forward of any residual deposit into the new demand note. Clause 2.3 (p2) deals with applications for LT supply where the load qualifies for HT, directing the licensee to give an LT connection but levy the non-refundable charges notified for both HT and LT, with metering at the HT supply point. A worked illustration table (p2) sets out the charge computation for one such load.

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Connection and miscellaneous charges, New connections and load changes, Security deposit

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document