Supply Code and Performance Standards Regulations, 2017 — Second Amendment, 2018 — Draft

Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) (Second Amendment) Regulations, 2018

Draft amendmentDated 4 Jul 2018No. F.17(85)/DERC/Engg./2017-18/5855

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Delhi Electricity Regulatory Commission's draft Second Amendment to its Supply Code and Performance Standards Regulations, 2017, issued under the Commission's own powers and pursuant to directions from the Government of NCT of Delhi under s.108 of the Electricity Act 2003. It is drafted for gazette publication and states that it takes effect from that publication; no gazette date is printed (p1).

Regulation 2 rewrites three elements of Regulation 20 (security deposit). It changes the threshold in the second proviso of sub-Regulation (1) from '1MVA' to '100kW' (p1). It substitutes sub-Regulation (7) on what happens to a security deposit when a connection is transferred, adding provisos on a shortfall against the recomputed deposit and on transfer to a legal heir (p1–2). It also substitutes sub-Regulation (8) on payment of additional security deposit when sanctioned load or contract demand is revised upward, splitting payment between upfront amounts and accumulation of interest, with a Note referring to adjustments in ensuing bills after 1.9.2017 (p2).

Regulation 3 replaces the second proviso and explanation to Regulation 21(2), dealing with differential Service Line cum Development Charges where the service line is actually changed on load enhancement, and defines additional load for that purpose (p2). Regulation 4 substitutes Regulation 22(1), obliging developers and applicants to provide land space free of charge for grid substations, transformers, switchgear and meters, with provisos for government agencies and, where there is no developer, requiring the licensee to approach the Government of NCT of Delhi within fifteen days (p2–3).

Regulation 5 amends Regulation 29 to give smart-meter consumers the option of having the meter installed inside their premises, and substitutes sub-Regulation (4) to prefer ground-floor meter locations in multi-storey buildings (p3). A closing Note records the publication history of the Principal Regulations and the First Amendment (p3).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Security deposit, Connection and miscellaneous charges, Metering

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document