Delhi Supply Code and Performance Standards Regulations, 2017 — Draft
Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017
Draft regulationDated 20 Feb 2017No. F.17(85)/Engg./DERC/15-16/5109/-----
Draft
A proposal that has since been finalised as the Delhi Supply Code and Performance Standards Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Delhi Electricity Regulatory Commission's draft notification for the Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) Regulations, 2017 (p1). It is made under the Electricity Act, 2003 and is a full supply code for all distribution and retail supply licensees, including deemed licensees, and for all consumers in the National Capital Territory of Delhi in relation to supply, use, diversion and abstraction of electricity (p1). It states it will come into force from the date of publication in the official Gazette; the Gazette date is not printed (p1).
Chapter I (p1-6) sets definitions and interpretation rules. Chapter II (p7-9) sets system and safety requirements: frequency, voltage levels and voltage variation limits, wiring and earth-leakage obligations, harmonics control, and distribution through franchisees. Chapter III (p10-28) lays out the new-connection process from application and proof of identity/ownership through field inspection, load sanction, demand note and energisation, plus single-point supply and conversion, temporary supply, and changes to existing connections such as transfer, load enhancement/reduction and reclassification.
Chapter IV (p29-33) covers agreements, termination, security deposits, Service Line cum Development charges, space for equipment, meter custody, damage liability and shifting of lines/meters. Chapter V (p34-50) governs metering, meter reading and testing, replacement of defective, burnt, stolen or tampered meters, meter costs and new metering technologies; it also sets billing and payment rules, including billing cycles, billing for defective/burnt/stolen meters, arrears, disputed bills, late payment surcharge, payment modes, receipts, appropriation of payments and installment schemes. Chapter VI (p51-53) specifies grounds and procedure for disconnection and reconnection, including unauthorized reconnection and consumer-requested disconnection.
Chapter VII (p54-63) sets enforcement procedures for unauthorized use of electricity under s.126 and theft under s.135, covering inspections, reports, provisional and final assessment, appeals, compounding, restoration and voluntary disclosure. Chapter VIII (p64-66) requires a complaint-handling manual and lays out complaint registration, no-current/low-voltage redressal and escalation to the Forum and Ombudsman. Chapter IX (p67-68) establishes guaranteed and overall standards of performance, compensation and penalty, the claims process and the bar on recovering such amounts through the Annual Revenue Requirement. Chapter X (p69-72) covers notice service, consumer-installation accidents, demand-side management, net-metering and open-access override, exemptions and force majeure, practice directions, relaxation, amendment and repeal/savings. Schedule I (p73-77) contains the guaranteed standards and compensation table; Schedule II (p78-80) contains overall standards and reliability indices.
Read with this
The regulation
- Dated 7 Jul 2017Delhi Supply Code and Performance Standards Regulations, 2017
Amendments and corrections
- Dated 2 Feb 2018Supply Code and Performance Standards (First Amendment) Regulations, 2018
- Dated 7 Mar 2018Supply Code and Performance Standards (First Amendment) Regulations, 2018 — Corrigendum
- Dated 25 Sep 2018Supply Code and Performance Standards Regulations, 2017 — Second Amendment, 2018
- Dated 18 Dec 2018Supply Code and Performance Standards (Third Amendment) Regulations, 2018
- Dated 24 May 2019Supply Code and Performance Standards, 2017 — Fourth Amendment, 2019
- Dated 16 Jul 2024Supply Code and Performance Standards Regulations, 2017 — Fifth Amendment, 2024
- Dated 2 Jun 2025Supply Code and Performance Standards Regulations, 2017 — Seventh Amendment, 2025
- Dated 25 Jun 2025Supply Code and Performance Standards Seventh Amendment Regulations, 2025 — Corrigendum
Commencement notices and reasons
- Dated 31 Jul 2017Schedule of Charges and Procedure under Supply Code and Performance Standards Regulations, 2017 — Statement of Reasons
- Date not statedSupply Code and Performance Standards Regulations, 2017 — Statement of Objects and Reasons
- Date not statedSchedule of Charges and the Procedure (Sixth Amendment) Order, 2021 — Explanatory Note
Procedures and orders made under it
- Dated 31 Aug 2017Schedule of Charges and Procedure under the Supply Code and Performance Standards Regulations, 2017 — Order
- Dated 27 Sep 2017Delhi Supply Code and Performance Standards (Removal of Difficulty) First Order, 2017
- Dated 28 Sep 2017Schedule of Charges and the Procedure (First Amendment) Order, 2017
- Dated 10 Oct 2017First Relaxation Order, 2017 — Supply Code and Performance Standards Regulations, 2017 (prepaid meters)
- Dated 2 Feb 2018Schedule of Charges and the Procedure Order, 2017 — Second Amendment, 2018
- Dated 6 Feb 2018Delhi Electricity Supply Code and Performance Standards (Removal of Difficulty) Second Order, 2018
- Dated 26 Jun 2018Clarification on levy of temporary surcharge for unauthorised use of electricity, 2018
- Dated 4 Jul 2018Schedule of Charges and the Procedure (Third Amendment) Order, 2018
- Dated 5 Sep 2018Notification of Laboratory for Testing of Tampered Meters under Supply Code and Performance Standards Regulations, 2017 — Order, 2018
- Dated 24 Sep 2018Delhi Electricity Supply Code and Performance Standards (Removal of Difficulty) Third Order, 2018
- Dated 27 Feb 2019Manual of Practices for Handling Consumers' Complaints, 2019
- Dated 16 Apr 2019Manual of practice for handling consumer complaints — review of customer care centre timings
- Dated 31 May 2019Delhi Electricity Supply Code and Performance Standards (Relaxation) Second Order, 2019
- Dated 23 Oct 2019Schedule of Charges and the Procedure Order, 2017 — Fourth Amendment, 2019
- Dated 30 Dec 2019Schedule of Charges and the Procedure (Fifth Amendment) Order, 2019
- Dated 4 May 2020Delhi Electricity Supply Code and Performance Standards (Relaxation) Third Order, 2020
- Dated 25 Aug 2020Refund of Security Deposit and Other Credits on Termination of Connection — Clarification, 2020
- Dated 15 Apr 2021Schedule of Charges and the Procedure (Sixth Amendment) Order, 2021
- Dated 27 Apr 2021Suspension of Standards of Performance Order, 2021
- Dated 22 Jun 2021Revocation of Order dated 27.04.2021
- Dated 3 Feb 2022Order in the matter of Order dtd. 10/01/2022
- Dated 1 Jul 2026Delhi Electricity Supply Code and Performance Standards — Fourth Removal of Difficulty Order, 2026
- Date not statedNew Connection Application Form
Proposed changes (drafts with no final yet)
- Dated 5 Jul 2024Supply Code and Performance Standards (Sixth Amendment) Regulations 2024 — Draft
- Dated 2 Jul 2024Public notice: Public Notice — Draft Supply Code and Performance Standards (Sixth Amendment) Regulations, 2024
Earlier drafts
- Dated 7 Jul 2017Draft Schedule of Charges and Procedure under Supply Code and Performance Standards Regulations, 2017
- Dated 1 Jan 2018Schedule of Charges and the Procedure (Third Amendment) Order, 2018 — Draft
- Dated 1 Jan 2018Public notice: Draft Schedule of Charges and the Procedure (Third Amendment) Order, 2018 — Public Notice
- Dated 4 Jul 2018Supply Code and Performance Standards Regulations, 2017 — Second Amendment, 2018 — Draft
- Dated 4 Jul 2018Public notice: Supply Code and Performance Standards, 2017 — Second Amendment, 2018 — Public Notice — Draft
- Dated 28 Feb 2019Supply Code and Performance Standards (Fourth Amendment) Regulations, 2019
- Dated 7 Jun 2024Supply Code and Performance Standards, 2017 — Fifth Amendment, 2024 — Draft
- Dated 7 Jun 2024Public notice: Supply Code and Performance Standards Regulations, 2017 — Fifth Amendment, 2024 — Public Notice on Draft
- Dated 1 May 2025Supply Code and Performance Standards Regulations, 2017 — Seventh Amendment, 2025 — Draft
- Dated 1 May 2025Public notice: Supply Code and Performance Standards Regulations, 2017 — Seventh Amendment, 2025 — Public Notice — Draft
3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.