DERC · Delhi Electricity Regulatory Commission

Delhi Electricity Supply Code and Performance Standards — Fourth Removal of Difficulty Order, 2026

Delhi Electricity Supply Code and Performance Standards (Removal of Difficulty) Fourth Order, 2026

OrderDated 1 Jul 2026F.17(174)/DERC/Engg./2026-27/8873/ dated 01/07/2026

Made under the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Delhi Electricity Regulatory Commission's fourth removal-of-difficulty order deals with a narrow but consequential cost question: who pays for the grid-side infrastructure that serves electric-vehicle charging sites set up under the central PM E-DRIVE Scheme (p1, p3).

The recitals (p1–2) lay out the difficulty. The DERC (Supply Code and Performance Standards) Regulations, 2017 require a licensee to raise a demand note on an applicant seeking load sanction and to energise EV Public Charging Stations, Battery Swapping Stations and Battery Charging Stations once that note is paid. For LT connections up to 200 kW sanctioned load, Regulation 11(3)(ii) confines the demand note to Service Line cum Development charges, security deposit and road restoration charges, with the remaining upstream cost absorbed in the licensee's Aggregate Revenue Requirement and recovered through tariff from all Delhi consumers. The Government of India's PM E-DRIVE Scheme (Gazette S.O. 4259(E), 29 September 2024) subsidises precisely that upstream infrastructure, and its first subsidy tranche is released only against a certification that demand notes paid to DISCOMs cover it. Delhi Transco Limited, designated State Nodal Agency by the NCT of Delhi Power Department (letter dated 24.11.2025), told the Commission (letter dated 20.05.2026) that continuing the ordinary demand note would push those costs onto consumer tariffs instead of the subsidy. The Commission finds a difficulty in applying Regulation 11(3)(ii) and invokes its relaxation and difficulty-removal power under Regulation 85.

The operative part (p3–4) waives that restriction for scheme sites: notwithstanding Regulation 11(3)(ii), the distribution licensee must raise the demand note — on the Charge Point Operator or the State Nodal Agency — so that it captures the full upstream infrastructure cost, and the order enumerates what that covers. It fixes the Cost Data Book as the basis for estimating the cost, bars the amounts from the licensee's ARR, requires separate accounts and records, and puts DTL in charge of a consolidated record and quarterly progress reporting to the Commission. It also lets the Commission issue further directions and ties the order's life to the currency of the PM E-DRIVE Scheme or a successor (p4).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Connection and miscellaneous charges, ARR and true-up, Subsidy and cross-subsidy

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.