Supply Code and Performance Standards (Third Amendment) Regulations, 2018

Delhi Electricity Regulatory Commission (Supply Code and Performance Standards) (Third Amendment) Regulations, 2018

AmendmentDated 18 Dec 2018No. F.17(85)/DERC/Engg./2018-19/6213 dated 18.12.2018

Amends the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the third amendment to DERC's 2017 Supply Code and Performance Standards Regulations. It is issued as a notification by the Commission's Secretary, dated 18 December 2018, and was made after directions from the Government of NCT of Delhi under s.108 of the Electricity Act (p1, p6). Clause 1 says it takes effect from publication in the official Gazette, but the Gazette date is not printed; the closing note gives only the publication dates of the Principal Regulations (17 August 2017) and the First and Second Amendments (p1, p6).

Clause 2 adds to Regulation 70 a duty on the licensee to send a confirmation message with restoration date and time after supply is restored (p1). Clause 3 substitutes Regulation 76 in full, setting out how compensation claims are made, decided and paid. It requires the licensee to publish its claim-settling offices and designated officers, to pay compensation by adjustment against the consumer's bill/CA number (by a Commission-approved non-cash route for non-consumers), and it lays down parallel procedures for two situations: failures of standards other than supply failure, where the affected person claims within a set period and the licensee must settle within a set period with written reasons for refusal; and restoration failures, where compensation is automatic, outage statements go with each bill, affected consumers are identified from the licensee's own records, and credit follows within a fixed window (pp2–4). Disputes escalate from the Forum for redressal of grievances to the Ombudsman, which may award interest at bank rate on non-supply failures and an enhanced amount on upheld power-supply-failure claims; the licensee must report credited compensations to the Commission weekly (pp3–4).

Clause 4 substitutes Schedule-I Point 14 and the accompanying Note, covering restoration standards and compensation bands, exclusions for consumers with outstanding dues or recent theft/unauthorised-use findings, and the day-counting conventions (pp4–6).

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Standards of performance, Billing and payment, Consumer grievance redressal (CGRF)

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document