DERC · Delhi Electricity Regulatory Commission
Notification of Laboratory for Testing of Tampered Meters under Supply Code and Performance Standards Regulations, 2017 — Order, 2018
Notification of Laboratory for testing of tampered meter under Delhi Electricity Regulatory Commission (Supply Code & Performance Standards) Regulations, 2017
OrderDated 5 Sep 2018F.17(44)/Engg./DERC/2013-14/PGC/3978 dated 05.09.2018
Made under the Delhi Supply Code and Performance Standards Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a DERC order (No. F.17(44)/Engg./DERC/2013-14/PGC/3978) dated 05.09.2018 notifying Electronics Regional Test Laboratory (North), Okhla Industrial Area Phase-II, New Delhi, as the laboratory for testing meters suspected of tampering, under Regulation 32(8) of the DERC (Supply Code and Performance Standards) Regulations, 2017 (p1). The laboratory was finalized by the Public Grievances Cell, Department of Power, Government of NCT of Delhi (p1).
Pages 1–2 set out the machinery. Testing charges are to be as per Annexure-I (p1). The licensee must remove the meter, seal it in the consumer's presence with paper seals signed by both sides, and prepare a seizure memo listing specified particulars — consumer account number, consumer name, meter number and type, container and seal numbers, date of removal, physical status of the meter, the licensee's authorised person's contact details and the memo number (p1). The sealed container, seizure memo and the laboratory's Service Request Form, indicating the parameters to be tested, must reach the laboratory within three days of removal (p1–2). The laboratory acknowledges receipt after verifying the container and its seal; testing is scheduled in consultation with the laboratory with prior notice to the consumer under the Order dated 31.08.2017 on Schedule of Charges and the Supply Code Regulations as amended from time to time (p2). A technical officer of the Public Grievances Cell witnesses the test and jointly signs the test report, and the licensee must collect the report (p2). The order applies from notification and remains in force till revised (p2).
Annexure-I (pp3–4) is the testing schedule: external physical/visual checks on the meter box and seals, checks on the CT unit, functional tests, accuracy tests separately for single-phase and three-phase meters, meter data download (daily energy history, MD history and recorded event flags over stated windows), internal inspection after opening the meter, and photo documentation, with a witness charge.
Read with this
The regulation
- Dated 7 Jul 2017Delhi Supply Code and Performance Standards Regulations, 2017
Amendments and corrections
- Dated 2 Feb 2018Supply Code and Performance Standards (First Amendment) Regulations, 2018
- Dated 7 Mar 2018Supply Code and Performance Standards (First Amendment) Regulations, 2018 — Corrigendum
- Dated 25 Sep 2018Supply Code and Performance Standards Regulations, 2017 — Second Amendment, 2018
- Dated 18 Dec 2018Supply Code and Performance Standards (Third Amendment) Regulations, 2018
- Dated 24 May 2019Supply Code and Performance Standards, 2017 — Fourth Amendment, 2019
- Dated 16 Jul 2024Supply Code and Performance Standards Regulations, 2017 — Fifth Amendment, 2024
- Dated 2 Jun 2025Supply Code and Performance Standards Regulations, 2017 — Seventh Amendment, 2025
- Dated 25 Jun 2025Supply Code and Performance Standards Seventh Amendment Regulations, 2025 — Corrigendum
Commencement notices and reasons
- Dated 31 Jul 2017Schedule of Charges and Procedure under Supply Code and Performance Standards Regulations, 2017 — Statement of Reasons
- Date not statedSupply Code and Performance Standards Regulations, 2017 — Statement of Objects and Reasons
- Date not statedSchedule of Charges and the Procedure (Sixth Amendment) Order, 2021 — Explanatory Note
Procedures and orders made under it
- Dated 31 Aug 2017Schedule of Charges and Procedure under the Supply Code and Performance Standards Regulations, 2017 — Order
- Dated 27 Sep 2017Delhi Supply Code and Performance Standards (Removal of Difficulty) First Order, 2017
- Dated 28 Sep 2017Schedule of Charges and the Procedure (First Amendment) Order, 2017
- Dated 10 Oct 2017First Relaxation Order, 2017 — Supply Code and Performance Standards Regulations, 2017 (prepaid meters)
- Dated 2 Feb 2018Schedule of Charges and the Procedure Order, 2017 — Second Amendment, 2018
- Dated 6 Feb 2018Delhi Electricity Supply Code and Performance Standards (Removal of Difficulty) Second Order, 2018
- Dated 26 Jun 2018Clarification on levy of temporary surcharge for unauthorised use of electricity, 2018
- Dated 4 Jul 2018Schedule of Charges and the Procedure (Third Amendment) Order, 2018
- Dated 24 Sep 2018Delhi Electricity Supply Code and Performance Standards (Removal of Difficulty) Third Order, 2018
- Dated 27 Feb 2019Manual of Practices for Handling Consumers' Complaints, 2019
- Dated 16 Apr 2019Manual of practice for handling consumer complaints — review of customer care centre timings
- Dated 31 May 2019Delhi Electricity Supply Code and Performance Standards (Relaxation) Second Order, 2019
- Dated 23 Oct 2019Schedule of Charges and the Procedure Order, 2017 — Fourth Amendment, 2019
- Dated 30 Dec 2019Schedule of Charges and the Procedure (Fifth Amendment) Order, 2019
- Dated 4 May 2020Delhi Electricity Supply Code and Performance Standards (Relaxation) Third Order, 2020
- Dated 25 Aug 2020Refund of Security Deposit and Other Credits on Termination of Connection — Clarification, 2020
- Dated 15 Apr 2021Schedule of Charges and the Procedure (Sixth Amendment) Order, 2021
- Dated 27 Apr 2021Suspension of Standards of Performance Order, 2021
- Dated 22 Jun 2021Revocation of Order dated 27.04.2021
- Dated 3 Feb 2022Order in the matter of Order dtd. 10/01/2022
- Dated 1 Jul 2026Delhi Electricity Supply Code and Performance Standards — Fourth Removal of Difficulty Order, 2026
- Date not statedNew Connection Application Form
Proposed changes (drafts with no final yet)
- Dated 5 Jul 2024Supply Code and Performance Standards (Sixth Amendment) Regulations 2024 — Draft
- Dated 2 Jul 2024Public notice: Public Notice — Draft Supply Code and Performance Standards (Sixth Amendment) Regulations, 2024
Earlier drafts
- Dated 20 Feb 2017Delhi Supply Code and Performance Standards Regulations, 2017 — Draft
- Dated 7 Jul 2017Draft Schedule of Charges and Procedure under Supply Code and Performance Standards Regulations, 2017
- Dated 1 Jan 2018Schedule of Charges and the Procedure (Third Amendment) Order, 2018 — Draft
- Dated 1 Jan 2018Public notice: Draft Schedule of Charges and the Procedure (Third Amendment) Order, 2018 — Public Notice
- Dated 4 Jul 2018Supply Code and Performance Standards Regulations, 2017 — Second Amendment, 2018 — Draft
- Dated 4 Jul 2018Public notice: Supply Code and Performance Standards, 2017 — Second Amendment, 2018 — Public Notice — Draft
- Dated 28 Feb 2019Supply Code and Performance Standards (Fourth Amendment) Regulations, 2019
- Dated 7 Jun 2024Supply Code and Performance Standards, 2017 — Fifth Amendment, 2024 — Draft
- Dated 7 Jun 2024Public notice: Supply Code and Performance Standards Regulations, 2017 — Fifth Amendment, 2024 — Public Notice on Draft
- Dated 1 May 2025Supply Code and Performance Standards Regulations, 2017 — Seventh Amendment, 2025 — Draft
- Dated 1 May 2025Public notice: Supply Code and Performance Standards Regulations, 2017 — Seventh Amendment, 2025 — Public Notice — Draft
3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.