Notification of Laboratory for Testing of Tampered Meters under Supply Code and Performance Standards Regulations, 2017 — Order, 2018

Notification of Laboratory for testing of tampered meter under Delhi Electricity Regulatory Commission (Supply Code & Performance Standards) Regulations, 2017

OrderDated 5 Sep 2018F.17(44)/Engg./DERC/2013-14/PGC/3978 dated 05.09.2018

Made under the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a DERC order (No. F.17(44)/Engg./DERC/2013-14/PGC/3978) dated 05.09.2018 notifying Electronics Regional Test Laboratory (North), Okhla Industrial Area Phase-II, New Delhi, as the laboratory for testing meters suspected of tampering, under Regulation 32(8) of the DERC (Supply Code and Performance Standards) Regulations, 2017 (p1). The laboratory was finalized by the Public Grievances Cell, Department of Power, Government of NCT of Delhi (p1).

Pages 1–2 set out the machinery. Testing charges are to be as per Annexure-I (p1). The licensee must remove the meter, seal it in the consumer's presence with paper seals signed by both sides, and prepare a seizure memo listing specified particulars — consumer account number, consumer name, meter number and type, container and seal numbers, date of removal, physical status of the meter, the licensee's authorised person's contact details and the memo number (p1). The sealed container, seizure memo and the laboratory's Service Request Form, indicating the parameters to be tested, must reach the laboratory within three days of removal (p1–2). The laboratory acknowledges receipt after verifying the container and its seal; testing is scheduled in consultation with the laboratory with prior notice to the consumer under the Order dated 31.08.2017 on Schedule of Charges and the Supply Code Regulations as amended from time to time (p2). A technical officer of the Public Grievances Cell witnesses the test and jointly signs the test report, and the licensee must collect the report (p2). The order applies from notification and remains in force till revised (p2).

Annexure-I (pp3–4) is the testing schedule: external physical/visual checks on the meter box and seals, checks on the CT unit, functional tests, accuracy tests separately for single-phase and three-phase meters, meter data download (daily energy history, MD history and recorded event flags over stated windows), internal inspection after opening the meter, and photo documentation, with a witness charge.

Standard name
Electricity Supply Code, Standards of Performance
Primary topics
Metering, Theft and unauthorised use

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document