Skip to content

DERC · Delhi Electricity Regulatory Commission

Schedule of Charges and the Procedure (Third Amendment) Order, 2018

OrderDated 4 Jul 2018F.17 (174)/DERC/Engg./2017-18/5885/ dated 4/7/2018

Made under the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A short three-clause amendment by the Delhi Electricity Regulatory Commission to its Schedule of Charges and the Procedure Order dated 31.08.2017 (the 'Principal Order'), issued under Regulations 84 and 87 of the DERC (Supply Code and Performance Standards) Regulations, 2017. It is the third amendment to that order and takes effect from the date of issue, 4 July 2018 (p1).

The operative change is narrow: in Clause 6(4)(iii) of the Principal Order the qualifying plot size is replaced, the earlier words 'plot of size above 300 sqm or above' being substituted by 'plot of size 500 sqm or above' (p1). Clause 3 then replaces two annexures wholesale — Annexure I, the application format for a new connection, and Annexure IV, the application format for load enhancement (p1).

The bulk of the document is those two substituted formats. Annexure I (pp2–6) is a blank new-connection application: applicant and premises details, category of electricity usage, load and contract demand applied for, PAN, metering preference, documents to be attached, and a twenty-clause applicant undertaking covering co-owner consent, safety compliance, building height and fire/lift clearance, tariff-category proof, indemnities, payment of tariff and deposits, meter access and the licensee's grounds for disconnection. Annexure IV (pp7–10) is the load-enhancement form with its own declaration and undertaking.

For an analyst the value is the revised forms that licensees must put into use, plus the single threshold change; no rates or charges are altered.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Conditions of supply

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document