Schedule of Charges and the Procedure Order, 2017 — Second Amendment, 2018

Schedule of Charges and the Procedure (Second Amendment) Order, 2018

OrderDated 2 Feb 2018F.17 (85)/Engg./DERC/2017-18/5855 dated 02.02.2018

Made under the Delhi Supply Code and Performance Standards Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short DERC amendment order issued on 02.02.2018 that changes the Commission's Schedule of Charges and the Procedure Order dated 31.08.2017, called here "the Principal Order" (p1). It is made by the Delhi Electricity Regulatory Commission using Regulation 84 of the DERC (Supply Code and Performance Standards) Regulations, 2018 (p1).

Clause 1 sets the short title and commencement: the Order takes effect from the date of its issue, i.e. 02.02.2018, with no separate Gazette publication date given (p1).

Clause 2 amends Clause 1 of the Principal Order by inserting two further provisos into the system-of-supply provisions (p1). The first lets a licensee release a new connection at 3 phase 4 wire, 400/415 V supply where the applicant's load demand is between 5 kW and 10 kW and the applicant asks for it. The second lets an existing consumer in the same 5–10 kW load band convert from single phase to 3 phase 4 wire at 400/415 V after demonstrating the need, against payment of differential service line cum development charges if any, as per Regulation 21(2) of the DERC (Supply Code and Performance Standards) Regulations, 2017 (p1).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
New connections and load changes, Connection and miscellaneous charges, Conditions of supply

Read with this

Procedures and orders made under it

3 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗