Skip to content

CERC · Central Electricity Regulatory Commission

Open Access in Inter-state Transmission (Fourth Amendment) Regulations, 2016 — Explanatory Memorandum — Draft

Draft 'Central Electricity Regulatory Commission (Open Access in Inter-state Transmission) (Fourth Amendment) Regulation, 2016'

Explanatory memorandum to a draftReleased with the notice dated 3 May 2016

Explanatory memorandum to the Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft-stage Explanatory Memorandum issued by CERC for the proposed Central Electricity Regulatory Commission (Open Access in Inter-state Transmission) (Fourth Amendment) Regulation, 2016 (p1). It sets out the case made by PXIL for changing how NLDC operating charges are levied on power exchange participants in the Day Ahead Market, and the Commission's own analysis and proposed direction.

Pages 1–5 reproduce PXIL's grounds: the existing socialisation of NLDC operating charges favours the larger exchange; reducing the flat charge from Rs 5000 to Rs 2000 per regional entity addressed the level but not the nature of the charge; the cost-to-serve principle no longer fits the changed participant mix; and small open access consumers are disadvantaged. PXIL proposes either a per-participant charge irrespective of exchange or a per-MWh charge on scheduled energy, and lists advantages such as uniform charges, certainty and alignment with other short-term market charges (pp4–5).

Pages 6–10 give the Commission's analysis. It recalls that the issues were considered in Petition 124/MP/2013 and in the draft Third Amendment dated 03.07.2014, and that the final Third Amendment retained the flat charge but reduced it to Rs 2000 per regional entity (p6). It sets out four options: continue the regional flat fee; charge per participant; remove operating charges on short-term open access customers; or charge in proportion to scheduled energy (p6). It reproduces earlier reasoning from the draft Third Amendment and the Statement of Reasons, including POSOCO's concerns about computational complexity and the argument that system operation effort does not vary with energy volume (pp8–10). A table on p7 shows the effect of the reduction on charges paid by participants on PXIL and IEX; another on p11 converts NLDC charges into Rs/MWh over six months.

The Commission concludes that the reduction rationalised charges but an inter-exchange difference remains, and proposes to amend the Open Access Regulations to levy operating charges on the basis of energy scheduled (MWh) (pp10–11). It states that the Fourth Amendment has been proposed accordingly (p11).

Standard name
Open Access Regulations
Primary topics
Open access, SLDC and RLDC fees and charges, Power markets and exchanges

Read with this

The regulation

Other copies of these documents (6)

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document