CERC · Central Electricity Regulatory Commission
Open Access in Inter-state Transmission (Fourth Amendment) Regulations, 2016 — Explanatory Memorandum — Draft
Draft 'Central Electricity Regulatory Commission (Open Access in Inter-state Transmission) (Fourth Amendment) Regulation, 2016'
Explanatory memorandum to a draftReleased with the notice dated 3 May 2016
Draft
The draft has since been finalised as the Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016.
Explanatory memorandum to the Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft-stage Explanatory Memorandum issued by CERC for the proposed Central Electricity Regulatory Commission (Open Access in Inter-state Transmission) (Fourth Amendment) Regulation, 2016 (p1). It sets out the case made by PXIL for changing how NLDC operating charges are levied on power exchange participants in the Day Ahead Market, and the Commission's own analysis and proposed direction.
Pages 1–5 reproduce PXIL's grounds: the existing socialisation of NLDC operating charges favours the larger exchange; reducing the flat charge from Rs 5000 to Rs 2000 per regional entity addressed the level but not the nature of the charge; the cost-to-serve principle no longer fits the changed participant mix; and small open access consumers are disadvantaged. PXIL proposes either a per-participant charge irrespective of exchange or a per-MWh charge on scheduled energy, and lists advantages such as uniform charges, certainty and alignment with other short-term market charges (pp4–5).
Pages 6–10 give the Commission's analysis. It recalls that the issues were considered in Petition 124/MP/2013 and in the draft Third Amendment dated 03.07.2014, and that the final Third Amendment retained the flat charge but reduced it to Rs 2000 per regional entity (p6). It sets out four options: continue the regional flat fee; charge per participant; remove operating charges on short-term open access customers; or charge in proportion to scheduled energy (p6). It reproduces earlier reasoning from the draft Third Amendment and the Statement of Reasons, including POSOCO's concerns about computational complexity and the argument that system operation effort does not vary with energy volume (pp8–10). A table on p7 shows the effect of the reduction on charges paid by participants on PXIL and IEX; another on p11 converts NLDC charges into Rs/MWh over six months.
The Commission concludes that the reduction rationalised charges but an inter-exchange difference remains, and proposes to amend the Open Access Regulations to levy operating charges on the basis of energy scheduled (MWh) (pp10–11). It states that the Fourth Amendment has been proposed accordingly (p11).
Read with this
The regulation
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
Amendments and corrections
- Dated 20 May 2009Open Access in inter-State Transmission (Amendment) Regulations, 2009
- Dated 10 Jun 2009Open Access in inter-State Transmission Regulations, 2008 — Corrigendum, 2009
- Dated 10 Jun 2009Open Access (Amendment) Regulations, 2009 — Corrigenda
- Dated 11 Sep 2013Open Access in inter-State Transmission (Second Amendment) Regulations, 2013
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
- Dated 12 Dec 2019Open Access in inter-State Transmission (Sixth Amendment) Regulations, 2019
- Dated 20 Mar 2020Open Access Regulations, 2008 — Sixth Amendment — Commencement Notification, 2020
- Dated 15 Jun 2010Changes some provisions: Sharing of ISTS Charges and Losses Regulations, 2010
- Dated 15 Jun 2010Changes some provisions: Sharing of Inter State Transmission Charges and Losses Regulations, 2010
Commencement notices and reasons
- Dated 4 Mar 2008Open Access in Inter-State Transmission System Regulations, 2008 — Statement of Reasons
- Dated 1 Jul 2009Open Access in Inter-State Transmission Regulations, 2008 — 2009 Amendment — Statement of Reasons
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015 — Statement of Objects and Reasons
- Dated 12 Jul 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016 — Statement of Objects and Reasons
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Statement of Reasons
- Dated 21 Mar 2022Notification — effective date 01.05.2022
- Dated 21 Mar 2022Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Commencement Notification
- Date not statedReal-Time Market Framework — Statement of Reasons
Procedures and orders made under it
- Dated 1 Apr 2022Approval of Procedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
- Dated 1 Apr 2022Short Term Open Access in Inter-State Transmission through NOAR — Procedure, 2022
- Dated 6 May 2022Corrigendum to the NOAR STOA Procedure Order, 2022
- Date not statedProcedure for Short Term Open Access in inter-State Transmission System through NOAR, 2022
Other copies of these documents (6)
- Dated 25 Jan 2008Open Access in inter-State Transmission Regulations, 2008
- Dated 11 Sep 2013Open Access in inter-State Transmission Regulations, 2008 — Second Amendment, 2013
- Dated 12 May 2015Open Access in inter-State Transmission (Third Amendment) Regulations, 2015
- Dated 22 Jun 2016Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2016
- Dated 2 Jan 2019Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018
- Dated 12 Dec 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019
Earlier drafts
- Dated 3 Jul 2014Open Access in inter-State Transmission Regulations, 2008 — Third Amendment, 2014 — Draft
- Dated 3 Jul 2014Public notice: Open Access in inter-State Transmission (Third Amendment) Regulations, 2014 — Public Notice — Draft
- Released with the notice dated 3 Jul 2014Explanatory memorandum: Open Access in inter-State Transmission, 2008 — Third Amendment, 2014 — Explanatory Memorandum — Draft
- Dated 3 May 2016Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Draft
- Dated 3 May 2016Public notice: Open Access in inter-State Transmission, 2008 — Fourth Amendment, 2016 — Public Notice — Draft
- Dated 8 Aug 2018Open Access in inter-State Transmission Regulations, 2008 — Fifth Amendment, 2018 — Draft
- Released with the notice dated 8 Aug 2018Explanatory memorandum: Open Access in inter-State Transmission, 2008 — Fifth Amendment — Draft Explanatory Memorandum
- Dated 8 Aug 2018Public notice: Draft Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2018 — Public Notice
- Dated 6 Aug 2019Open Access in inter-State Transmission Regulations, 2008 — Sixth Amendment, 2019 — Draft
- Released with the notice dated 6 Aug 2019Explanatory memorandum: Real-Time Markets for Electricity — Explanatory Memorandum
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.