Skip to content

CERC · Central Electricity Regulatory Commission

Open Access in inter-State Transmission (Third Amendment) Regulations, 2014 — Public Notice — Draft

Draft Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Third Amendment) Regulations, 2014

Public notice on a draftDated 3 Jul 2014No. L-7/105(121)/2007-CERC dated 3rd July, 2014

Public notice on the Open Access in inter-State Transmission Regulations, 2008 — Third Amendment, 2014 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page public notice from CERC, dated 3 July 2014, giving previous publication of draft regulations that would amend the CERC (Open Access in inter-State Transmission) Regulations, 2008 (p1). The Commission states that it has made the draft Central Electricity Regulatory Commission (Open Access in inter-State Transmission) (Third Amendment) Regulations, 2014, and that the draft regulation and an Explanatory Memorandum are annexed to the notice and can also be downloaded from the CERC website (p1).

The notice invites comments, suggestions and objections on the draft, to be sent to the Secretary by 25 July 2014, and states that comments received after that date may not be considered while the regulations are finalised (p1). It is issued under the previous-publication requirement of section 178(3) of the Electricity Act, 2003 read with the Electricity (Procedure for Previous Publication) Rules, 2005 (p1). The draft regulation and memorandum themselves are not reproduced in the notice.

Standard name
Open Access Regulations
Primary topics
Open access

Read with this

The regulation

Other copies of these documents (6)

2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document